Wingineers Group

Wingineers Group Elevate your marine automation with Wingineers.

Our state-of-the-art, digital-based system architecture brings you advanced features that ensure speed, precision, redundancy, reliability, flexibility, and ease of maintenance.

14/01/2025

PART 3 : Rectification of UPS cargo system

The UPS are designed to protect critical onboard functions and processes, such as emergency lighting, communication, radio, navigation, loudspeakers, auxiliary power for engines and safety systems, but also PCs and servers. Even during the transition from the onboard power supply to shore power (cold ironing), short-term power fluctuations can occur, which can be intercepted by using an UPS.

Watch this space for the following section where we'll go over how to fix the UPS system.
Last part will be uploading soon....

follow us for more such content.

contact us: [email protected]

for updates:
Instagram: wingineers_group
Youtube : Wingineers.official



MAK  Main Engine decarb full spares.For DG  C18These are the genuine spares dispatch from our China company.Wingineers  ...
13/01/2025

MAK Main Engine decarb full spares.
For DG C18
These are the genuine spares dispatch from our China company.

Wingineers ship these kinds of goods and services to vessels. Please get in touch with us for these services.

Contact us: [email protected]

Follow us on
Youtube: Wingineers.official



13/01/2025

PART 2 : Rectification of UPS cargo system

The UPS are designed to protect critical onboard functions and processes, such as emergency lighting, communication, radio, navigation, loudspeakers, auxiliary power for engines and safety systems, but also PCs and servers. Even during the transition from the onboard power supply to shore power (cold ironing), short-term power fluctuations can occur, which can be intercepted by using an UPS.

Watch this space for the following section where we'll go over how to fix the UPS system.
Next part will be uploading soon....

contact us: [email protected]

follow us for updates:
Instagram: wingineers_group
Youtube : Wingineers.official






10/01/2025

PART 3: RECTIFICATION OF AMS (ALARAM MONITORING SYSTEM)

Alarm Monitoring System is developed to continuously monitor and display the alarms of the vessel's main systems. It shows the real-time status of the connected systems, such as the engine and steering system. The AMS application has multiple connections to external systems due to the use of serial communication.

This videos are about AMS extension panel programing and commissioning for terasaki make.

Email: [email protected]

https://youtu.be/ER_C_x-TsVU




08/01/2025

CLASS 6: PLC PROGRAMMING TRAINING

A programmable logic controller (PLC)-based communication system has been proposed and is expected to reduce accidents in the shipyard by providing an uninterrupted communication environment and safer working conditions.
Siemens PLC's are used where reliability control, simple programming and fault diagnosis are needed.
training conducted by head chief engineer at Namikai training institute.

Email: [email protected]
Follow us for more updates:

youtube :Wingineers.official



07/01/2025

Alarm Monitoring System is developed to continuously monitor and display the alarms of the vessel's main systems. It shows the real-time status of the connected systems, such as the engine and steering system. The AMS application has multiple connections to external systems due to the use of serial communication.

This videos are about AMS extension panel programing and commissioning for terasaki make.



07/01/2025

CLASS: 5 HANDLING OF EQUIPMENTS (AMMETER)

Training and understanding the fundamentals of training hands on using the various equipments.
An ammeter indicates the current flow through the battery charging system. A "zero center" ammeter, during chargine, shows a (+) positive reading indicating the current is flowing to the battery (charge).

Cat  DG  Decarb tools fabrication in house. manufacturing facility
05/01/2025

Cat DG Decarb tools fabrication in house.
manufacturing facility




Ac compressor  blitzer make was supplied along with installation done in sailing with 18 months warranty for our promina...
05/01/2025

Ac compressor blitzer make was supplied along with installation done in sailing with 18 months warranty for our prominant client

Team wingineers is your one point solution for all kind of supplies and services !!!

04/01/2025

Tank guaging system calibration and repair carried out without spare.
This service can help you ensure the accuracy of the measuring equipment on the tank.

techteam

Address

A-1303 Pearl Palace, Chandiwala Complex, Jogeshwari West
Mumbai
400102

Alerts

Be the first to know and let us send you an email when Wingineers Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share