NICCO Engineering Services Limited

Directions Website

NICCO Engineering Services Limited Speciality maintenance service provider | Manufacturer and Exporter Leak Sealing Compounds and Restrictors

A 25-year-old concrete wall in a power plant had suffered visible deterioration due to aging, high operating temperature...
05/05/2026

A 25-year-old concrete wall in a power plant had suffered visible deterioration due to aging, high operating temperature, and long-term exposure to the plant environment.

With surface cracks, spalling, staining, and uneven damaged areas, the structure required a practical in-situ repair solution that could restore the concrete profile without major civil reconstruction.

Using Belzona 4111, the damaged sections were rebuilt and resurfaced, creating a smoother and more uniform finish while helping the plant avoid extended downtime.

This case demonstrates how Belzona cold-applied repair systems can help extend the serviceability of aged concrete structures in demanding industrial environments.

Read the complete case study here:
https://www.niccoengineering.com/restoring-an-aged-concrete-wall-in-a-power-plant-with-belzona-4111/

14/04/2026

Critical Leak Sealed Without ShutdownA major refinery faced a high-risk crack in a Venturi FT line handling Propylene, w...
13/04/2026

Critical Leak Sealed Without Shutdown

A major refinery faced a high-risk crack in a Venturi FT line handling Propylene, where failure could have caused a complete shutdown.

Nicco Engineering Solution:
• Custom-designed clamp with perfect fit
• Online Leak Sealing (OLS) under live conditions
• No shutdown, no hot work

Result:
• Zero leakage
• Zero incidents
• Shutdown successfully avoided

Precision engineering. Safe ex*****on. Zero downtime.

Read the complete case study: https://www.niccoengineering.com/emergency-venturi-ft-clamp-installation-at-propylene-recovery-unit-pru/

On this joyful occasion, we extend our warmest wishes to our valued clients, trusted partners, and the dedicated team th...
02/03/2026

On this joyful occasion, we extend our warmest wishes to our valued clients, trusted partners, and the dedicated team that keeps our operations running with precision and care.

Wishing you a safe, colourful, and joyous Holi! 🌸✨

𝐈𝐧-𝐒𝐢𝐭𝐮 𝐒𝐮𝐜𝐜𝐞𝐬𝐬 𝐚𝐭 𝐚 𝐩𝐫𝐨𝐦𝐢𝐧𝐞𝐧𝐭 𝐫𝐞𝐟𝐢𝐧𝐞𝐫𝐲 𝐢𝐧 𝐈𝐧𝐝𝐢𝐚 | 𝐖𝐚𝐬𝐭𝐞 𝐇𝐞𝐚𝐭 𝐁𝐨𝐢𝐥𝐞𝐫 𝐆𝐚𝐬𝐤𝐞𝐭 𝐅𝐚𝐜𝐞 𝐑𝐞𝐬𝐭𝐨𝐫𝐚𝐭𝐢𝐨𝐧Our team executed precision ...
09/02/2026

𝐈𝐧-𝐒𝐢𝐭𝐮 𝐒𝐮𝐜𝐜𝐞𝐬𝐬 𝐚𝐭 𝐚 𝐩𝐫𝐨𝐦𝐢𝐧𝐞𝐧𝐭 𝐫𝐞𝐟𝐢𝐧𝐞𝐫𝐲 𝐢𝐧 𝐈𝐧𝐝𝐢𝐚 | 𝐖𝐚𝐬𝐭𝐞 𝐇𝐞𝐚𝐭 𝐁𝐨𝐢𝐥𝐞𝐫 𝐆𝐚𝐬𝐤𝐞𝐭 𝐅𝐚𝐜𝐞 𝐑𝐞𝐬𝐭𝐨𝐫𝐚𝐭𝐢𝐨𝐧

Our team executed precision in-situ machining on a Single Pass Flue Tube Waste Heat Boiler (Ø3170 mm), restoring both shell and dome gasket faces affected by pitting and damage.

Using an ID-mounted, pneumatically operated Furmanite SILK Fl**ge Facer in both horizontal and vertical configurations, we achieved the required parameters and surface finish without dismantling major equipment.

𝘒𝘦𝘺 𝘣𝘦𝘯𝘦𝘧𝘪𝘵𝘴 𝘥𝘦𝘭𝘪𝘷𝘦𝘳𝘦𝘥:
> In-situ ex*****on
> Shutdown time saving
> Reliable gasket seating restoration
> Faster readiness for reassembly and operation

Call 033 6628 5001 or Visit: www.niccoengineering.com

**geFacing

We are hiring a Manager-marketing for Hyderabad. This position is also open for Chennai and Navi Mumbai. Send your resum...
21/01/2026

We are hiring a Manager-marketing for Hyderabad. This position is also open for Chennai and Navi Mumbai. Send your resume to [email protected]

31/12/2025

Address

Infinium Digispace, 4th Floor, CP-15, Sector V, Salt Lake City
Kolkata
700091

Opening Hours

Monday 10am - 6pm
Tuesday 10am - 6pm
Wednesday 10am - 6pm
Thursday 10am - 6pm
Friday 10am - 6pm

Alerts

Be the first to know and let us send you an email when NICCO Engineering Services Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share