Civtect India Private Limited

Civtect India Private Limited A leading infrastructure development firm specializing in National Highways. From oil refineries to flyovers.

It all started in the year 1988 when Civtect India Private Limited was formed with the aim of bringing a new-age of infrastructure development and civil construction that can stand the test of time. The first project assigned to us was the construction of the LPG Bottling plant of Indian Oil Corporation Limited at Muchipara and there has been no looking back ever since. From then onwards, we have

forayed into various types of engineering construction ranging from highways to railways. From residential housing to industrial sheds- we have made our mark and built our reputation as industry stalwarts. We are not only an engineering firm but also a consulting agency. Because of our technical expertise, we were entrusted with the renovation and re-building of turnkey projects which were built ages before we came into existence. Over the last three decades, we have become a name to reckon with in the field of engineering and civil construction. A name that has become synonymous with quality, expertise, and diligence.

09/09/2024

We have recently been awarded the following EPC projects:

1. Improvement and widening to two lanes with paved shoulder from km 101+300 to km 127+319 (total length 26.019 Km) i.e. the Khowai -Teliamura section of NH 208 (Package l) in the state of Tripura on EPC mode via JICA ODA Loan Phase - VI under NHIDCL with an NIT cost of Rs 269 crores.

2. Widening and strengthening of existing alignment from km 64+70 to km 72+119 and from km 78+600 to km 81+800 to 2L+PS and construction of 2L+PS Ramnagar By-pass from km 72+119 to km 78+600 of NH-116B in the district of Purba Mednipur in the State of West Bengal under Annual Plan 2022-23 in EPC mode under Ministry of Road Transport and Highways, Government of India with an NIT cost Rs 286 crores.

In this context, we are actively recruiting experienced highway engineers, structural engineers, supervisors, and QA/QC engineers. Feel free to check out the job postings and send your resume at [email protected].

30/04/2023

Khowai-Srirampur Package V project under the supervision of NHIDCL has been completed by us. It has drastically reduced the travel time and the project was completed within the stipulated time period.

It was indeed an honor for us to host him.
12/04/2023

It was indeed an honor for us to host him.

Santraganchi bowstring bridge ready to be inaugurated.
05/02/2023

Santraganchi bowstring bridge ready to be inaugurated.

Aerial views from the project - widening and strengthening of Pataspur-Banguchak road from 0.00 km to 28.00 km along wit...
13/01/2023

Aerial views from the project - widening and strengthening of Pataspur-Banguchak road from 0.00 km to 28.00 km along with the construction of three new RCC girder bridges under the Midnapore Highway Division.

Today, the honorable Prime Minister Shri Narendra Modi inaugurated our project- two-lane with paved shoulder of Khayerpu...
18/12/2022

Today, the honorable Prime Minister Shri Narendra Modi inaugurated our project- two-lane with paved shoulder of Khayerpur-Amtali section of NH-8 in the state of Tripura under the supervision of NHIDCL. We are extremely proud of the fact that we completed this project before the scheduled deadline.

18/11/2022

Happy to annnounce that we have completed the widening and strengthening of Pataspur-Banguchak road from 0.00 km to 28.00 km along with the construction of three new RCC girder bridges under Midnapore Highway Division.

01/11/2022

We are pleased to announce that we have been awarded the following EPC projects:

1. Widening and reconstruction of existing pavement to two lanes with paved shoulder with service road from 0.000 km to 42.250 km, Package I of NH-320G in the state of Jharkhand. The job value of the project is Rs 236 crores.

2. Construction of strengthening and widening to two lanes with a paved shoulder on NH-319A from 0.000 km to 45.000 km Mohania Chausa Road in the state of the Bihar. The job value of the project is Rs 222 crores.

In this context, we are currently recruiting senior project managers, highway engineers, structural engineers, supervisors and survey engineers with significant experience in EPC projects. Interested candidates, kindly send your resume to [email protected].

5 bridge girders (30 meter in length) erected over Charial Canal in 7 hours.
07/08/2022

5 bridge girders (30 meter in length) erected over Charial Canal in 7 hours.

Happy to announce that we have completed the improvement and widening to two-lane with paved shoulder of Khayerpur-Amtal...
05/07/2022

Happy to announce that we have completed the improvement and widening to two-lane with paved shoulder of Khayerpur-Amtali section of NH-8 in the state of Tripura before the scheduled date of completion under the supervision of NHIDCL, a nodal agency of Ministry of Road Transport and Highways, Government of India.

Address

73/29 Golf Club Road
Kolkata
700033

Opening Hours

Monday 10am - 7pm
Tuesday 10am - 7pm
Wednesday 10am - 7pm
Thursday 10am - 7pm
Friday 10am - 7pm

Telephone

+913324731166

Alerts

Be the first to know and let us send you an email when Civtect India Private Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Civtect India Private Limited:

Share