The Ceiling Space War Nobody Talks About
Imagine you're standing on-site.
The HVAC contractor says:
"My duct needs this space."
The Fire Protection team responds:
"Our sprinkler main runs through here."
The Electrical team argues:
"The cable trays were approved first."
Then the Structural Engineer joins:
"There's a beam exactly where all of you want to build."
Suddenly, a ceiling that looked perfectly fine on drawings becomes a battlefield.
❌ Ducts clash with pipes
❌ Cable trays block access panels
❌ Fire systems violate clearances
❌ Rework begins
The issue wasn't construction.
The issue was coordination.
With BIM coordination, these conflicts are identified in the model—not on the jobsite.
Without BIM coordination, every discipline works blindly.
💬 What's the worst ceiling clash you've encountered?