Coordination vs. Shop vs. As-Built: Are Your MEP Drawings Aligned? ⚡🍁
In complex commercial builds, using the wrong type of MEP drawing at the wrong project stage guarantees on-site clashes, wasted materials, and schedule delays.
Understanding the specific function of each drawing type is critical for a smooth handover between consultants and contractors.
Our guide clarifies the core differences:
✅ Coordination Drawings: The proactive "collision check" ensuring HVAC, plumbing, and electrical systems share the ceiling void seamlessly.
✅ Shop Drawings: The highly-detailed, fabrication-ready manuals used on the workshop floor.
✅ As-Built Drawings: The final, vital record of what was actually installed for future facility management.
Ensure your team is building from the right documentation.