21/05/2025
Since 2018, our company has proudly served as the fire services system installation contractor for the Tseung Kwan O – Lam Tin Tunnel project. We were responsible for the design, installation, commissioning, and coordination of all fire services systems. As of the end of 2024, we are pleased to announce the successful completion of all works, along with the final inspections approved by the Hong Kong Fire Services Department.
This project is recognised as one of Hong Kong’s top ten infrastructure developments. It comprises a dual two-lane carriageway approximately 3.8 kilometres long, connecting Po Shun Road in Tseung Kwan O in the east with the proposed Trunk Road T2 in the Kai Tak Development in the west. Around 2.2 kilometres of the route is tunnelled. The tunnel not only addresses the increasing transport needs of Tseung Kwan O, but also forms part of Route 6 – a major east-west expressway linking West Kowloon with Tseung Kwan O via the Trunk Road T2 and the Central Kowloon Route.
The project was delivered in phases, with the main tunnel officially opened to traffic in late 2022. Subsequent completion of electrical and mechanical buildings, along with associated fire protection systems, followed thereafter. Spanning the most challenging period of the COVID-19 pandemic between 2019 and 2022, the project demanded a high level of technical expertise and coordination, making it one of the most complex undertakings for our team.
The successful completion of this long-term and technically demanding project would not have been possible without the professionalism, perseverance, and teamwork of our entire company. We would like to express our sincere gratitude to Mr Face Wu and Mr Ray Ip for their outstanding leadership and dedication throughout the project, as well as to all colleagues and project partners for their invaluable contributions.
Together, we continue to deliver excellence in fire services engineering for Hong Kong’s infrastructure development.