28/04/2026
🔧 Tray Replacement & Rail Track Upgrade 🔧
Maintaining critical infrastructure in wood treatment and timber impregnation plants is essential for safe, efficient, and reliable operations.
We recently completed a full tray replacement and rail track upgrade, delivering a 21-metre heavy-duty solution designed to improve performance, durability, and day-to-day reliability within a demanding industrial environment.
The Challenge
In wood treatment plants, components such as rail track trays and handling systems are constantly exposed to heavy loads, moisture, chemicals, and long-term wear. Over time, this can lead to corrosion, misalignment, and reduced efficiency—impacting both safety and productivity.
The Solution
We designed, manufactured, and installed a robust replacement system tailored to the existing plant setup. The upgrade included:
▪️ 5mm thick mild steel construction for increased strength
▪️ Precision folding to match existing rail profiles
▪️ Corrosion-resistant coating suited to harsh environments
▪️ Improved tray design to enhance fluid recovery and durability
Installation Process
A full turnkey approach ensured minimal disruption:
• Removal of existing tray and preparation of the base structure
• Installation of the new 21-metre rail track tray system
• Reinstallation and refurbishment of existing rails and walkways
• Alignment checks and commissioning to ensure smooth, safe operation
Key Outcomes
This upgrade has delivered:
✔️ Improved operational safety✔️ Increased reliability of handling systems✔️ Enhanced resistance to corrosion✔️ Reduced downtime and maintenance issues✔️ Longer service life of the installation
A straightforward but critical upgrade that helps keep production running smoothly and efficiently.
If you’re experiencing wear issues, handling problems, or looking to modernise existing equipment, we’re always happy to discuss practical upgrade and replacement solutions.