Mactech Energy Group

Call Directions Website

Mactech Energy Group We build reliable workforces for nuclear and low-carbon projects. With decades of experience and nearly 2,000 placements at Hinkley Point C.

We understand regulated sites, move fast on clearances, and get the right skills in place when projects need them.

Meet the Mactech pets 🐢 😺Our team’s dogs and cats are strutting their stuff for the Great North Dog and Cat Show, raisin...
16/10/2026

Meet the Mactech pets 🐢 😺

Our team’s dogs and cats are strutting their stuff for the Great North Dog and Cat Show, raising funds for Newcastle Dog and Cat Shelter & Cat Shelter, right on our doorstep in the North East.

Link to donate and enter your own dog or cat below πŸ‘‡
https://newcastledogandcatshelter.enthuse.com/GNDCS #!/

Hinkley Point C has finished tunnelling its fish return system.EDF (UK) announced on 1 October that the tunnel boring ma...
09/10/2026

Hinkley Point C has finished tunnelling its fish return system.

EDF (UK) announced on 1 October that the tunnel boring machine Sarah Guppy has completed a 620 metre drive under the Bristol Channel. The tunnel took five months to dig, and the machine was then recovered from the seabed by a floating crane.

It completes more than 8km of marine tunnels on the project. The fish return system is one of three fish protection measures, alongside an acoustic fish deterrent and four low-speed water intakes, which EDF values at around Β£700 million.

Hinkley Point C is scheduled to start generating power in 2030.
That points to sustained demand across marine and civil engineering, tunnelling, lifting operations, mechanical and electrical installation and commissioning, as the site moves from major civils towards systems completion.

[Image: EDF]

Hinkley Point B has officially entered decommissioning.On 1 October, ownership of the Somerset station transferred from ...
05/10/2026

Hinkley Point B has officially entered decommissioning.

On 1 October, ownership of the Somerset station transferred from EDF (UK) to the Nuclear Decommissioning Authority, with Nuclear Restoration Services now managing the site. Around 250 staff have moved across, and an 85-year decommissioning programme begins.

It is the second AGR to transfer, following Hunterston B in April, and more will follow.

That points to sustained demand across health physics, safety case engineering, waste management, project controls and experienced site trades, at the same time as Hinkley Point C next door needs many of the same people.

[Photo: Rick Crowley, CC BY-SA 2.0, via Geograph]

Ending the week on a high with some amazing feedback 😎 Shoutout to all of our teams, who always go above and beyond for ...
02/10/2026

Ending the week on a high with some amazing feedback 😎

Shoutout to all of our teams, who always go above and beyond for our candidates!

Address

17/23 Claremont Road
Whitley Bay
NE263TN

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+(44) 191 252 1762

Alerts

Be the first to know and let us send you an email when Mactech Energy Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share