15/06/2026
Construction of a neat and tidy tarmac footpath, including the removal and disposal of existing artificial grass, timber, and general waste, together with the backfilling of the pond area.
Strip out the existing footway and prepare the sub base. Install Terram geotextile membrane, followed by a layer of compacted stone. Fit pressure treated (tanalised) timber edging boards and complete the path with a tarmac surface finish.
We also created the seating area, including preparation of the ground and installation of a paved surface using Indian sandstone, providing an attractive and durable seating space to complement the footpath.
Contact us for a free, no obligation quote
π 07803536888
π§ [email protected]
π» www.pbcivils.com