Ar-Be-Da Services Ltd

Ar-Be-Da Services Ltd Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Ar-Be-Da Services Ltd, Metal Fabricator, 2 Leslie’s Lane, Turriff.

Storm damage roof repair. Customer was quoted a ridiculous amount for a straight forward repair job. Completed fast and ...
25/05/2026

Storm damage roof repair. Customer was quoted a ridiculous amount for a straight forward repair job. Completed fast and efficiently with customer absolutely delighted.

Monopitch 40ft X 30ft shed erected by us and steel portal frame supplied by HG Fabrication Services. Ideal wee shed idea...
13/05/2026

Monopitch 40ft X 30ft shed erected by us and steel portal frame supplied by HG Fabrication Services. Ideal wee shed ideal for equipment storage or livestock.

30 metre long steading, cladded in slate blue 5.6 metre box profile sheets. completed this week.
15/04/2026

30 metre long steading, cladded in slate blue 5.6 metre box profile sheets. completed this week.

Steading Gable Refurbishment, with the old door way being too small, customer wanted a higher & wider door. All steel wo...
11/04/2026

Steading Gable Refurbishment, with the old door way being too small, customer wanted a higher & wider door. All steel work and sliding door fabricated on site measuring 3m high and 3.4m wide.

A great 30ft X 80ft Dutch barn shed, Steel erected and cladded by us a while back. With 9” X 3” timber roof purlins fitt...
22/03/2026

A great 30ft X 80ft Dutch barn shed, Steel erected and cladded by us a while back. With 9” X 3” timber roof purlins fitted with fiber cement sheets. Slate blue box profile side & gable cladding.

A recent project of a 120ft-60ft steel portal building. Roof sheeted with concrete fibre and skylights. Vented box profi...
03/03/2026

A recent project of a 120ft-60ft steel portal building. Roof sheeted with concrete fibre and skylights. Vented box profile side cladding and gable cladded.

A bespoke 6 metre decommissioning pipe grab & and single grab both fitted with dual port hot stab and receptacle. Work c...
23/01/2026

A bespoke 6 metre decommissioning pipe grab & and single grab both fitted with dual port hot stab and receptacle. Work carried out for customer.

A 20ft container fully refurbished and converted into a fully working test tank for Rov tooling and General purpose.
19/12/2025

A 20ft container fully refurbished and converted into a fully working test tank for Rov tooling and General purpose.

A quick repair carried out on a 2012 Ford tipper van. Floor worn thin replaced with 4mm sheet. Also frame repaired due t...
29/11/2025

A quick repair carried out on a 2012 Ford tipper van. Floor worn thin replaced with 4mm sheet. Also frame repaired due to excessive rust. All vehicle repairs considered.

One of our previous jobs carried out early this year. Slates stripped & reclaimed , then cladding with merlin grey box p...
23/11/2025

One of our previous jobs carried out early this year. Slates stripped & reclaimed , then cladding with merlin grey box profile sheets, on a 22 metre steading. With full length skylights on one side to customers preference.

Address

2 Leslie’s Lane
Turriff
AB534FL

Website

Alerts

Be the first to know and let us send you an email when Ar-Be-Da Services Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share