RMD Profiles Ltd

RMD Profiles Ltd We help you source material for quality structural floor and roof with the fastest delivery available

24/06/2026

Not every job needs a deep deck. Here's where ComFlor 46 earns its place. 👇

ComFlor 46 is the shallower profile in the composite decking range, and that shallow depth is exactly what makes it useful.

A reduced slab depth keeps the overall floor build-up down, which can be a real advantage where floor to floor heights are tight or where the design is working hard to control structural depth. It's a practical, efficient option for the right project.

Choosing the right profile from the start saves time, steel, and cost later, and that's something our drawing office helps contractors get right every day.

🎬 This is Part 1, so keep an eye out for the next one.

📐 Not sure which profile suits your project? Talk to the team.
🌐 https://rmdp.co.uk/floor-decks/comflor-46/
📞 01787 275055 ✉️ [email protected]

Openings and apertures are a normal part of any composite slab. The question is whether they've been planned properly, o...
22/06/2026

Openings and apertures are a normal part of any composite slab. The question is whether they've been planned properly, or just left for site to figure out.

There are two ways to form them: boxing out before the concrete is poured, or core drilling after the slab has gained at least 75% of its strength. Decking should never be cut before that point. 🚫

A few simple rules make all the difference: 👇

🔹 Small openings (up to 300mm): usually no extra reinforcement needed
🔹 Medium openings (300mm to 700mm): typically need additional reinforcement in each orthogonal direction
🔹 Large openings (greater than 700mm): must be trimmed with permanent steelwork connected back to the primary supports, and that trimming steel needs to be installed before the decking

Spacing matters too. Openings closer than 1.5W of the larger opening start behaving as one combined opening. The distance between an opening and an unsupported edge should be at least the opening's own width. And no more than a quarter of any bay or deck span should be removed by openings. 📏

Get this right early and the slab design stays efficient. Get it wrong and you're adding steel later.

Our team helps contractors plan openings correctly from the outset, so the design works first time. ✅

🕳️ Need a hand reviewing slab openings on your project? Speak to the team.
🌐 https://rmdp.co.uk/our-services/floor-supply-and-design/
📞 01787 275055 ✉️ [email protected]

Most people don't realise how much something as simple as deck bearing impacts a deck install. 🤔If decking sheets don't ...
19/06/2026

Most people don't realise how much something as simple as deck bearing impacts a deck install. 🤔

If decking sheets don't have enough clear projection past the toe of the steel beam, they physically won't sit correctly. The result? Sheets end up strapped in place. It works, but it's not the ideal detail, and it slows the job down.As a general rule of thumb:

🔹 50mm bearing on steel
🔹 75mm bearing on block, ICF, masonry or structural timber

That clear projection gives the sheets proper bearing and leaves enough room to fix them down properly with a shot fired gun. No strapping. No workarounds. A cleaner, faster install. ✅

This is exactly the kind of detail that should always be designed in from the start, not solved on site under pressure.

At RMD, our drawing office picks these things up early, so your team isn't problem solving on a deck.📐

Planning a project? Send your steelwork drawings to our team and we'll review the decking detail before it becomes a site issue.
🌐 https://rmdp.co.uk/our-services/floor-supply-and-design/
📞 01787 275055 ✉️ [email protected]

The real site manager:☕ The coffee van.Because somehow… everyone appears exactly when it arrives.
18/06/2026

The real site manager:

☕ The coffee van.

Because somehow… everyone appears exactly when it arrives.

What is ICF construction?ICF stands for Insulated Concrete Formwork, a building method using interlocking insulated bloc...
17/06/2026

What is ICF construction?

ICF stands for Insulated Concrete Formwork, a building method using interlocking insulated blocks filled with reinforced concrete.

Why is ICF becoming more popular?

✔ Excellent thermal performance
✔ Improved energy efficiency
✔ Reduced air leakage
✔ Strong structural performance
✔ Faster build programmes

ICF systems are increasingly used in residential and low-energy developments where energy efficiency and long-term performance matter.

Where composite floor decking meets an ICF structure, the bearing detail matters, typically 75mm onto block, ICF, masonry or timber, compared with 50mm onto steel. Getting that right early keeps the sheets sitting correctly and the install clean.

Smarter building methods are shaping the future of construction.

🌐 https://rmdp.co.uk/our-products/floor-products/
📞 01787 275055
✉️ [email protected]

MYTH: Composite metal decking is only suitable for massive developments.FACT: Composite decking systems are used across ...
16/06/2026

MYTH: Composite metal decking is only suitable for massive developments.

FACT: Composite decking systems are used across a wide range of projects, from smaller residential and commercial builds to large-scale multi-storey developments.
The right profile depends on:

✔ Span requirements
✔ Loading
✔ Programme
✔ Structural design
✔ Site conditions

Good design is about choosing the right system for the project, not simply the biggest one.

Not sure which profile suits your project? The RMD team can help.

🌐 https://rmdp.co.uk/our-products/floor-products/
📞 01787 275055
✉️ [email protected]

FAQ: What is composite action in metal decking?Composite action is the interaction between the steel beams, shear studs,...
16/06/2026

FAQ: What is composite action in metal decking?

Composite action is the interaction between the steel beams, shear studs, metal decking, and concrete slab, all working together as a single structural element.
The process works by:

✔ Metal decking acting as permanent formwork during construction

✔ Shear studs connecting the concrete slab to the steel beams

✔ The concrete bonding with the deck profile

✔ The steel and concrete sharing structural loads
This composite action increases the strength and efficiency of the floor system, allowing longer spans and reducing the amount of structural steel required.
Benefits include:

▪ Improved structural performance
▪ More efficient use of materials
▪ Longer span capabilities
▪ Faster construction programmes

Composite floor systems are widely used across commercial, industrial, healthcare, and mixed-use developments throughout the UK.

Need technical guidance? The RMD team can help.
🌐 https://rmdp.co.uk/composite-floor-decking-in-the-uk-clear-choices-faster-floors/
📞 01787 275055
✉️ [email protected]

For specifiers and engineers, the pressure isn’t just performance.It’s:• Getting it right first time• Avoiding redesign•...
10/06/2026

For specifiers and engineers, the pressure isn’t just performance.

It’s:
• Getting it right first time
• Avoiding redesign
• Keeping projects moving

That’s where early collaboration makes the difference.
📞 Call 01787 275055 or visit: rmdp.co.uk/floor-decks/comflor-80


Every construction site has one person who says:“That’ll only take 5 minutes.” 😅Three hours later… everyone’s still wait...
09/06/2026

Every construction site has one person who says:

“That’ll only take 5 minutes.” 😅

Three hours later… everyone’s still waiting for the delivery slot.

Construction projects run on timing, coordination, and communication, especially when multiple trades are working at once.

Good planning keeps projects moving.

Construction projects rarely go exactly to plan.Deadlines shift. Deliveries change. Site conditions evolve.But the proje...
06/06/2026

Construction projects rarely go exactly to plan.

Deadlines shift. Deliveries change. Site conditions evolve.

But the projects that succeed are usually backed by teams that adapt quickly, communicate clearly, and keep moving forward.

In construction, consistency matters just as much as speed.

Every drawing reviewed, every deck installed, every delivery coordinated, it all contributes to keeping a project moving safely and efficiently.

Progress is built one decision at a time.

Here’s to the teams solving problems on site every single day. 👏

Need support with your next floor or roof decking project?

🌐 https://page.rmdp.co.uk/
☎️ 01787 275055
📧 [email protected]

Address

9 Gaol Lane, Sudbury
Suffolk
CO101JL

Alerts

Be the first to know and let us send you an email when RMD Profiles Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RMD Profiles Ltd:

Share