Millennium Power

Millennium Power High and Low voltage Electrical Power Engineers

21/03/2023

We are

Posted 7:31:50 PM. commissioning experience and willing to expand on their current knowledgeSee this and similar jobs on LinkedIn.

Northern division out early this morning carrying out maintenance tasks ready for the big game ahead ๐Ÿ‰
03/04/2022

Northern division out early this morning carrying out maintenance tasks ready for the big game ahead ๐Ÿ‰

Midlands division called out to a 11kv-433v oil transformer with unusual sound. After removal of the lid it became appar...
31/03/2022

Midlands division called out to a 11kv-433v oil transformer with unusual sound. After removal of the lid it became apparent this had suffered serious internal damage. Caught in good time before the damage could have more wide spread. If in doubt, check it outโ—๏ธ

We have been extremely busy the first quarter of the year which we thought would have been the quiet time of the year. A...
18/03/2022

We have been extremely busy the first quarter of the year which we thought would have been the quiet time of the year. All hands have been on deck from transformer modifications to switchgear installs and relay upgrades. Cable division have been out in full force to.๐Ÿ‘ทโ€โ™‚๏ธ

Although our office is closed over the festive period, we are available for emergency call out works as always.Please ca...
23/12/2021

Although our office is closed over the festive period, we are available for emergency call out works as always.
Please call 0333 444 4041 or e-mail [email protected]

www.mpl.uk.com

We have joined forces with  who are our cable division taking on all cable, jointing and various other works across the ...
29/11/2021

We have joined forces with who are our cable division taking on all cable, jointing and various other works across the uk. ๐Ÿ”Œ

120mm 11kv cable termination ๐Ÿ”ฅ southern division
21/11/2021

120mm 11kv cable termination ๐Ÿ”ฅ southern division

Panel delivered on site to a switch room ready for an existing switchboard to be extended.๐Ÿงฉ๐Ÿงฉ
19/11/2021

Panel delivered on site to a switch room ready for an existing switchboard to be extended.๐Ÿงฉ๐Ÿงฉ

Solkor relays retrofitted to existing switchgear using our bespoke additional top boxes carried by the northern division...
14/11/2021

Solkor relays retrofitted to existing switchgear using our bespoke additional top boxes carried by the northern division ๐Ÿ—œ

Client wanted a larger LV feeder pillar for the site requirements. Old removed from transformer, new replaced. Swipe for...
13/11/2021

Client wanted a larger LV feeder pillar for the site requirements. Old removed from transformer, new replaced. Swipe for a post install pic. ๐Ÿ”ง southern division

We are hiring again.Millennium Power are looking to add a permanent full time High Voltage commissioning engineer to our...
06/11/2021

We are hiring again.

Millennium Power are looking to add a permanent full time High Voltage commissioning engineer to our growing team:

Immediate start - Salary + overtime + company vehicle + expenses + pension

Please send CVโ€™s to:
[email protected]

Package sub commissioning with the northern division๐Ÿ“‹
05/11/2021

Package sub commissioning with the northern division๐Ÿ“‹

Routine maintenance to a cast resin transformer from the Midlands division ๐Ÿงน
04/11/2021

Routine maintenance to a cast resin transformer from the Midlands division ๐Ÿงน

33kv switchgear install today with our ever expanding team ๐Ÿ’ช๐Ÿป
17/08/2021

33kv switchgear install today with our ever expanding team ๐Ÿ’ช๐Ÿป

26/07/2021

Millennium Power are Proud Sponsors of Louis Johnson both home and away for the 21/22 season as part of their Platinum package.

Want to sponsor a player next year? Get in touch

05/07/2021

Huge thank you to our friends at Millennium Power who are supporting us as Platinum Partners for the 21/22 season

www.mpl.uk.com

๐Ÿด๓ ง๓ ข๓ ฅ๓ ฎ๓ ง๓ ฟ
04/07/2021

๐Ÿด๓ ง๓ ข๓ ฅ๓ ฎ๓ ง๓ ฟ

Transformer and cable install - Film studio, London. Office@mpl.uk.com for all install and commissioning works.
23/06/2021

Transformer and cable install - Film studio, London.
[email protected] for all install and commissioning works.

Address

Stokesley
TS95JZ

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Millennium Power posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Videos

Share