14/05/2026
There’s no shortage of project momentum across renewables and energy infrastructure right now.
What’s coming through in conversations at All-Energy is the gap between that momentum and the electrical detail needed to move forward: grid connection applications, HV design, studies that need to be scoped early, and the connection strategy decisions that underpin it all.
The EPS team has been talking through exactly those challenges at Stand F38, covering power system studies, grid code compliance, earthing, HV/LV design and connection strategy with developers, ICPs, consultants and asset owners working across the sector.
If you didn’t make it across yesterday, the team are back today and available to talk through your project requirements.
Whether you’re in early-stage development or heading into detailed design, speak with the team before the show closes.
📍 Stand F38 | SEC Glasgow