29/07/2025
After a hugely successful Rail Live 2025 where our Undercutter was centre stage this is the ideal time to follow up with our promo video of a successful S&C ballast refurb. It is engineered for high-performance ballast renewal, capable of operating at 60 meters per hour.
Featuring hydraulic depth control, integrated spoil handling, and precision-guided cutter bars, allowing 1:30 drainage cross fall independent of track Cant. It enables efficient removal of fouled ballast whilst maintaining track geometry. Ideal for live rail environments and tight maintenance windows.
If you need to remove speed restrictions causing train delay minutes on your patch with minimal risk of disruption to schedules this is the kit for you!
⚡ To get in touch, contact us on 01785 241335 or email [email protected]
Manufactured by Rail-Ability Ltd