20/10/2026
Would your temporary works design stand up to scrutiny?
Compliance isn’t something that can be confirmed by a finished drawing alone.
There are decisions throughout the design process that need to be understood and justified - from the quality of the original brief and the competence of the designer through to risk, checking and the guidance being relied upon.
And that matters particularly when a design falls outside standard arrangements or when assumptions are being made about loads, site conditions or how a system will be used.
A checklist won’t make those decisions for you, but it can prompt the right questions before a design is issued.
Have the risks actually been considered? Is the chosen guidance applicable to this particular arrangement? Has the correct level of checking taken place? Can the decisions made throughout the design be explained and supported?
Compliance should be something you can demonstrate, not something you assume because a drawing has been produced.
We’ve put together 10 questions worth asking before any temporary works design is issued 👇🏼
And we think the most useful is the last:
Would you be comfortable defending the design if something went wrong?