17/08/2026
Before you sign off a metalwork installation on site, here are 5 things worth checking
1. Have the fixings been torqued? Confirm all fixings have been torqued to the correct specification. A balustrade that looks secure isn't always one that is.
2. Has the finish been checked? Inspect for any damage, inconsistency or missed areas before the client sees it. Much easier to address before handover than after.
3. Has it been load tested? Confirm the installation has been load rated to the required standard. Non-negotiable for anything carrying people.
4. Have the gaps been measured? Infill gaps should be checked against building regulations. BS 6180 sets the maximum opening sizes. If it's out, it fails.
5. Has the sign-off form been completed? Get it in writing. A completed sign-off form protects everyone on the project.
Miss one of these and the handover gets complicated. Get them all right and the job is done properly.
Save this one for your next project handover 📌