K-Fix Systems Ltd

Call Directions Website Contact the business

K-Fix Systems Ltd Specialists in the supply & installation of Architectural Metalwork and Glass systems.

Erith Quarry Project Series Part 1 | Hang-Off Balconies ๐Ÿ—๏ธRather than resting on a separate supporting frame, these balc...
18/10/2026

Erith Quarry Project Series Part 1 | Hang-Off Balconies ๐Ÿ—๏ธ

Rather than resting on a separate supporting frame, these balconies are hung directly off the main structure.

Every balcony is fully engineered to the required structural loading and safety standards so that residents get outdoor space that's as strong and secure as it looks.

Our team designed, fabricated and installed 18 hang-off balconies, matched to the existing structure and finished to spec.

More from this project as the series continuesโ€ฆ

Inside ๐Ÿ‘‰๐Ÿป out
14/10/2026

Inside ๐Ÿ‘‰๐Ÿป out

Wakefield Civic Quarter, The Series: Part 6๐Ÿ“Terrace mild steel balustrades for the upper-floor balconiesDesigned to feel...
10/10/2026

Wakefield Civic Quarter, The Series: Part 6๐Ÿ“

Terrace mild steel balustrades for the upper-floor balconies

Designed to feel solid and well-proportioned, they define the edges of the terraces while allowing the balconies themselves to remain open and usable. A simple but effective detail that contributes to the character of the upper levels and ties in with the other works we have completed across the project.

Part 7 coming soon. Follow the page to keep up with the full seriesโ€ฆ

Nearing completion at Erith Quarry Parcel 9. Our team is putting the finishing touches on a full package of works, inclu...
06/10/2026

Nearing completion at Erith Quarry Parcel 9. Our team is putting the finishing touches on a full package of works, including:

- Hang off balconies inclusive of fascia balustrade and aluminium decking
- External balcony steelwork and balustrades with mild steel copings to parapet wall
- Soffits and guttering
- Internal stair balustrade and wall rail
- Privacy screens
- Internal AOV

Full project breakdown series coming soonโ€ฆ

Bidfood project update ๐Ÿ› ๏ธThe external platforms are now complete, combining hard-wearing durbar walkways with secure key...
02/10/2026

Bidfood project update ๐Ÿ› ๏ธ

The external platforms are now complete, combining hard-wearing durbar walkways with secure key clamp balustrades to deliver safe, long-lasting access.

This system was designed with compliance built in from the start, not something to sort out at sign-off ๐Ÿ™…๐Ÿผโ€โ™€๏ธ

Handsworth School | External Canopy & Flashings ๐ŸซOur team installed the external canopy and flashings at Handsworth Scho...
28/09/2026

Handsworth School | External Canopy & Flashings ๐Ÿซ

Our team installed the external canopy and flashings at Handsworth School, creating a sheltered, welcoming entrance while keeping the outdoor look light and open. Thoughtful design and careful installation mean students and visitors can enjoy a safe, inviting space right from the moment they arrive.

20 metres of galvanised balustrade installed at AMP Waverley ๐Ÿ”A lot of rooftop balustrade jobs skip the mid rail. A top ...
23/09/2026

20 metres of galvanised balustrade installed at AMP Waverley ๐Ÿ”

A lot of rooftop balustrade jobs skip the mid rail. A top rail on its own might look finished but it leaves a gap big enough to fall through. That misses the whole point of the barrier.

This system was built with top and mid rails throughout, assembled using Kee Clamp fittings rated for the load. The galvanised finish is specified for rooftop exposure so there's no corrosion, no maintenance cycles and nothing to come back and fix.

If you're specifying rooftop edge protection and want it done right first time, get in touch:
๐Ÿ“ฒ 01709 646 740
๐Ÿ“ง [email protected]

A well-earned mention for two members of the K-Fix team: Liam and Sophie completed this year's Great North Run in suppor...
19/09/2026

A well-earned mention for two members of the K-Fix team: Liam and Sophie completed this year's Great North Run in support of the Cystic Fibrosis Trust ๐Ÿ’œ

Their motivation is a personal one. Their son Alfie was diagnosed with cystic fibrosis as a newborn back in 2020, and six years on he's thriving thanks to new modulator therapy drugs supported by CF research and care.

It's a cause close to home in more ways than one as K-Fix itself exists because of Alfie. While he was still in hospital as a newborn, Liam took a call from his employer at the time that offered him no support. That moment was the push he needed to step out on his own and build something better.

Liam and Sophie completed 13.1 miles to help fund the research and care that makes stories like Alfie's possible, and between them they've already smashed their ยฃ500 target.

Donations remain open for anyone who'd like to contribute to this amazing cause: https://ajbellgreatnorthrun2026.enthuse.com/pf/sophie-kay-69a59

A huge well done to both of you ๐Ÿ‘๐Ÿป

Handsworth School | External Handrails & Balustrades ๐ŸซWe crafted and installed several bespoke external balustrades and ...
15/09/2026

Handsworth School | External Handrails & Balustrades ๐Ÿซ

We crafted and installed several bespoke external balustrades and handrails. Each piece was carefully designed to fit the schoolโ€™s unique architecture, ensuring a seamless finish that is both functional and visually appealing, as well as weather-proof.

Before you sign off a metalwork installation on site, here are 5 things worth checking1. Have the fixings been torqued? ...
17/08/2026

Before you sign off a metalwork installation on site, here are 5 things worth checking

1. Have the fixings been torqued? Confirm all fixings have been torqued to the correct specification. A balustrade that looks secure isn't always one that is.
2. Has the finish been checked? Inspect for any damage, inconsistency or missed areas before the client sees it. Much easier to address before handover than after.
3. Has it been load tested? Confirm the installation has been load rated to the required standard. Non-negotiable for anything carrying people.
4. Have the gaps been measured? Infill gaps should be checked against building regulations. BS 6180 sets the maximum opening sizes. If it's out, it fails.
5. Has the sign-off form been completed? Get it in writing. A completed sign-off form protects everyone on the project.

Miss one of these and the handover gets complicated. Get them all right and the job is done properly.

Save this one for your next project handover ๐Ÿ“Œ

Address

Unit 11a Monksbridge Trading Estate
Sheffield
S253QZ

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 2pm

Telephone

+441709646740

Alerts

Be the first to know and let us send you an email when K-Fix Systems Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to K-Fix Systems Ltd:

Shortcuts

Share