09/06/2026
Thanks to everyone who voted in our warm weather solvent cementing poll.
The results showed two clear pressure points for site teams:
40% rushed preparation
40% cement drying too quickly
For PVC-U, PVC-C and ABS pipework, warm weather can reduce the room for error. That makes preparation even more important.
Clean surfaces, square cuts, correct chamfering, socket depth marking, even cement application and proper cure time all help reduce avoidable jointing problems.
To support installers, contractors and maintenance teams, we have created a practical summer solvent cementing checklist.
Download it here:
Download the IPS Summer Solvent Cementing Checklist for practical installation checks covering preparation, primer, cement, cure time and pressure testing.