17/08/2026
When the finished crusher bucket assembly arrives into the warehouse from fabrication and assembly, it has already been greased and tested on a basic hydraulic rig to ensure smooth operation of the machinery.
It then has hoses and hydraulic auto-crush control valves fitted, which is the stage pictured here. Another pressure test and run-up is then conducted, as part of the PDI process. This ensures every bucket goes out to the customer, ready to work.
We're not just pulling stuff out of a shipping container and hoping it's okay.