22/06/2026
π§ PUK Conversion Completed at a Research Laboratory π§
When the controls on the existing booster set failed, the site needed a reliable solution with minimal disruption.
Our team carried out a PUK conversion, reusing the existing manifolds while installing new pumps and control equipment. This approach reduced installation time, minimised downtime, and provided the site with a modern, reliable water boosting system.
π Well done to our team for another smooth installation.