Busy start to the year.
We were commissioned to make 2no separation drain tops for a yard to be concreted.
These frames will bring the FFL to the desired height for the yard they will be on.
Heavy sections were used as artic trucks at a combined 'loaded' weight of 44 tonnes, possibly more in the future will be turning round over these.
Also, the tops, to be concreted to be the same level as the yard, are all removable using the lift points, as well as the two steel beams in the thirds of the frames to allow the separation drains to be cleaned out using the machines the company own.
This was all designed by us, here at Keighley's of Longton Ltd.
Sent away for structural calculations to be done.
After fabrication, sent for galvanising to Roften Galvanising
All in all,, I think they will be able to take the weights and withstand the test of time.
Great job by all involved.
Onto the next job👌