DJR Engineering Limited

DJR Engineering Limited DJR Engineering along with DJR Welding provide an exceptional Welding & Fabrication Service, based in Oldmeldrum, Aberdeenshire.

We have been established for over 25 years and are fully equipped for all your needs.

Earlier this year, we had the pleasure of fabricating this 300t cruciform lift beam.A fantastic little project, giving o...
29/08/2022

Earlier this year, we had the pleasure of fabricating this 300t cruciform lift beam.
A fantastic little project, giving our team the chance to show off their skill set. Excellent prepping & plating skills along with some great welding to pass 100% UT.
Great effort put in by all involved and another successful job completed 👍👏👏

The last few months have been so busy, we can barely believe it's now August!  This job started early April, finally bei...
04/08/2022

The last few months have been so busy, we can barely believe it's now August!
This job started early April, finally being completed and delivered to our customer last month. It's been exciting to see the progress come to life from the initial drawings to the final positioning of the green deck to complete a new working platform.
The team here at DJR have done a fantastic job, and as always, backed up by our great suppliers, testers and painters. Well done to all invlolved 👏👏👏

Very busy month here and showing some great skills.  Scarfing, prepping, plating, 100% UT welding and finally heat strai...
26/05/2022

Very busy month here and showing some great skills. Scarfing, prepping, plating, 100% UT welding and finally heat straightening. Next stop paint shop, then straight to the rig for the upgrade to begin...
Next we start building the new deck that sits on these upgrades.
Great team effort from our suppliers, stockists, drivers, testers and our small team here at DJR 👏👏👏
Thanks to all who helped bring this project in on time and budget 👍

Great start to the New Year! 2 x DNV hose transfer baskets off to the painters ready for their 1st trip to Houston in 2w...
07/02/2022

Great start to the New Year! 2 x DNV hose transfer baskets off to the painters ready for their 1st trip to Houston in 2weeks time. Great team effort from suppliers, testers, DNV, and our work force working around the clock to deliver on time. 👌😀

Little job going through the workshop this week...55 Ton spreader/lifting beam, proof load to 66.8 Ton.  Client required...
04/11/2021

Little job going through the workshop this week...
55 Ton spreader/lifting beam, proof load to 66.8 Ton. Client required this to be Lloyds witnessed pre/post fabrications and load testing.
Great team effort from suppliers, testers, Lloyds and the team at DJR Engineering, well done all involved! 👍

Loading out on time for a valued customer a two storey BOP stack frame, including six removal platforms which once insta...
27/08/2021

Loading out on time for a valued customer a two storey BOP stack frame, including six removal platforms which once installed can be fitted around the BOP. Built complete with safety gates, removable handrails and two ladders with back scratchers. All fabricated in house. Fantastic team effort from all the guys and suppliers! 👍👏😀

Another great team effort delivering the job within a week 👍Our valued customer required a quick turnaround as they are ...
24/05/2021

Another great team effort delivering the job within a week 👍
Our valued customer required a quick turnaround as they are due to mobilise the following week.
A jetting head with 12" pipe extension and 12" lifting elbow.
Some great welding work on these pieces.

15/04/2021

During lockdown we fabricated this little tower for onshore/offshore access. Here's a nice action shot of getting it upright from transportation to a working tower. Great to see it Harbour side with the boat coming in...

The guys are being kept busy...One of our recent projects - Cantilever Walkway painted and grated ready for it's 1st tri...
15/04/2021

The guys are being kept busy...
One of our recent projects - Cantilever Walkway painted and grated ready for it's 1st trip offshore 😊
Great work 👍

The page may have been a little quiet over Christmas, however the guys are still busy working away and hit the new year ...
29/01/2021

The page may have been a little quiet over Christmas, however the guys are still busy working away and hit the new year running with a quick turnaround job for a valued customer.
These 120 Tonne Pad Eyes with machine bored 100mm holes & full pen welds were completed within a week.
Good job guys 👍

You may have spotted this one in the local papers last week... Something a bit more decorative from the guys.  This flow...
09/11/2020

You may have spotted this one in the local papers last week... Something a bit more decorative from the guys. This flower arch was designed, fabricated & site fitted by DJR (think someone with green fingers may have completed it with the flowers though 😂) Looks fab, another great job done 👍

Address

Unit 1, Station Road
Oldmeldrum
AB510EZ

Alerts

Be the first to know and let us send you an email when DJR Engineering Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share