30/01/2026
Jalna Construction has recently completed the fabrication of a replacement intervention panel and framework for a subsea cable laying machine. The original mild steel panel had experienced significant corrosion due to long term exposure to a saltwater environment. To address this, the new assembly was replicated and fabricated using high grade marine stainless steel to ensure long term durability and corrosion resistance.
All fabrication was carried out in our purpose built workshop within a dedicated stainless steel fabrication area, with careful control of weld quality and heat input to maintain material integrity and achieve a finish suitable for subsea service.
If you have an upcoming marine or subsea fabrication requirement, please contact our team to discuss your project.