13/01/2026
A great example of our Multisec Modular Spreader Beam in action on a challenging city lift in Speyer, Germany.
Configured to 50t WLL with an 11m effective working length, the beam was used to lift and install a pedestrian bridge over live railway tracks — an operation where accuracy and confidence in the lifting arrangement are essential.
The bridge was installed in four separate sections, two measuring 18 metres and two at 24 metres, with the modular setup allowing the load to be balanced and controlled throughout the lift despite the constraints of the urban environment.