Link365

Link365 ᴡᴇ ᴘʀᴏᴠɪᴅᴇ ᴄᴏᴍᴘʟᴇᴛᴇ ᴍᴇᴄʜᴀɴɪᴄᴀʟ, ᴇʟᴇᴄᴛʀɪᴄᴀʟ ᴀɴᴅ ʀᴇɴᴇᴡᴀʙʟᴇ ᴇɴᴇʀɢʏ ꜱᴏʟᴜᴛɪᴏɴꜱ.

Know Your Numbers Week 🩺Knowing your blood pressure numbers matters for everyone in the construction industry.It’s not o...
08/09/2026

Know Your Numbers Week 🩺

Knowing your blood pressure numbers matters for everyone in the construction industry.

It’s not only those working on site who experience pressure and stress. Long days, deadlines, workloads and day-to-day responsibilities can also affect the wellbeing of our office-based and offsite teams.

Whether you work on site, in the office or remotely, taking care of your health should always be a priority.

🩺 Get checked. Know your numbers. Stay healthy.

Our Portugal team were over in the UK and took the opportunity to visit the APEX site following their visit to 55 West E...
07/09/2026

Our Portugal team were over in the UK and took the opportunity to visit the APEX site following their visit to 55 West Ealing.

A great chance to catch up with the team, check progress and see the works first-hand.

And yes… we spotted the Madeira van in the background! 😂🇵🇹🚐

Even when they're visiting the UK, it seems Portugal follows them everywhere!

Great visit and great to have the team together. 👏

Have you heard about the Passivhaus the route to zero carbon?As the construction industry works towards Net Zero, improv...
03/09/2026

Have you heard about the Passivhaus the route to zero carbon?

As the construction industry works towards Net Zero, improving building efficiency has a major role to play.

This article from the Passivhaus Trust explains how reducing energy demand, improving building performance and using renewable energy can help move us closer to zero-carbon buildings.

A great read for anyone interested in Passivhaus, energy efficiency and the future of sustainable construction.

👉 Read the full article here : www.passivhaustrust.org.uk/competitions_and_campaigns/passivhaus-and-zero-carbon/

It was great to welcome our Portugal team to the 55 West Ealing project for a site visit, alongside our Operations Direc...
01/09/2026

It was great to welcome our Portugal team to the 55 West Ealing project for a site visit, alongside our Operations Director and Project Manager.

As much of the Portugal team is office-based, the visit was a valuable opportunity to see one of our live projects first-hand, gain a better understanding of the work taking place on site and see how plans and coordination come together in practice.

A productive site visit and a great opportunity to bring our teams together and experience the project beyond the office.

Indirect heat interface unit (HIU) should be maintained annually in accordance with EN 806-5 standards. Both systems nee...
27/08/2026

Indirect heat interface unit (HIU) should be maintained annually in accordance with EN 806-5 standards. Both systems need to be maintained: the primary system of the HIU itself and the secondary system being the radiators, showers and cylinders. The steps include:

- Visual check for leaks
- Check for possible active errors on the user interface and force a reset
- Test the correct operation of the pump
- Clean the strainers
- Check the expansion vessel pre-charge value and restore pressure value if
needed, then restore secondary circuit pressure
- Check safety relief valve is dry and that the drain is unobstructed
- Check for internal leaks through the modulating valves
- Check correct setting of the DHW and heating temperature set points
- Check the DHW flow rate at the correct temperature is sufficient

Ask us about our maintenance services which cover all mechanical engineering solutions for buildings https://link365.co.uk/aftercare-and-maintenance-services/

Ever wondered what sits above the ceiling?Before the ceilings are installed, this is where the engineering happens.The p...
21/08/2026

Ever wondered what sits above the ceiling?

Before the ceilings are installed, this is where the engineering happens.

The pipework and fan coil units shown here will work together to provide efficient heating and cooling throughout the building, helping create a comfortable indoor environment for future occupants.

Every installation is carefully planned to ensure reliability, efficiency and ease of maintenance.

Embracing modern methods of construction in the UK, our ventilation specialists are pre-fabricating ductwork ahead of in...
20/08/2026

Embracing modern methods of construction in the UK, our ventilation specialists are pre-fabricating ductwork ahead of installation ensuring everything is prepared and ready for seamless integration on site.

By insulating the ductwork at the workbench prior to installation, the team improves efficiency, enhances quality control, and delivers greater precision throughout the process.

This approach supports faster, safer, and more consistent project delivery.

Did you know? That a Commercial sprinkler systems provide more than fire suppression. By activating early in a fire, the...
19/08/2026

Did you know? That a Commercial sprinkler systems provide more than fire suppression. By activating early in a fire, they control the heat release rate, limit temperature rise, and reduce the generation and spread of smoke. This mitigates fire growth, protects structural integrity, and supports safe egress.

This image captures progress on our Lower Essex project.

Designed and maintained correctly, sprinkler systems are essential for meeting UK fire safety regulations and creating safer, more resilient buildings.

Net Zero is about more than reducing carbon, it's about creating buildings that perform better for people and the enviro...
18/08/2026

Net Zero is about more than reducing carbon, it's about creating buildings that perform better for people and the environment. 🌍

According to the Passivhaus Trust, better Net Zero buildings focus on reducing energy demand, improving indoor comfort, supporting healthier living spaces, and delivering long-term performance, not just meeting carbon targets on paper.

At Link365, we're proud to support projects that contribute to a more sustainable built environment.

📖 Read the full Passivhaus Trust article to learn more. https://passivhaus.uk/better-net-zero-buildings/

Progress is built one connection at a time.Every stage of an MEP installation requires precision, planning and teamwork....
17/08/2026

Progress is built one connection at a time.

Every stage of an MEP installation requires precision, planning and teamwork. Here, our engineer is continuing the rooftop pipework installation as the heating system comes together at our 55 West Ealing project.

Visit our website to view more progress https://link365.co.uk/55-west-ealing/

Address

Suite 314, Sterling House, Langston Road
Loughton
IG103TS

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Link365 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share