Rail Power Solutions

Rail Power Solutions Electrical Design Consultancy for Railways Client satisfaction is our utmost priority. Works have also included multi disciplinary design works.

Established in 2013, Rail Power Solutions (RPS) has grown rapidly to become a well-recognised and leading provider of electrical designs for the railway industry. Our reputation has been built on our ability to deliver expertise and a reliable service at the highest professional standards. We are Link-up approved under various design product codes and to ensure our commitment to health, safety and

the environment we have policies that meet Achilles audit requirements. Our Engineers have worked for Network Rail on various projects in the past, which include electrical and construction activities. These consist of TP Hut to substation conversions, Feeder renewals, ETE upgrade, TRU, HV and DC switchgear renewals. With the current railway market, RPS believes that principal contractors need design consultants to assist them in helping them deliver these requirements for the rail industry. With a reputation for delivering high standards of service using highly skilled and professional personnel, RPS strives to become a key infrastructure service provider. Principal contractors have relied on the professional expertise of RPS to help them deliver electrical designs and construction activities of the electrical infrastructure. Specialties:
DC Substation Design, Electric Track Equipment Design, HV Feeder and Pilot Cable Design, Construction Technical Support

Rail Power Solutions (RPS), alongside our valued client Balfour Beatty, visited Beckton Depot today as part of the Beckt...
05/06/2026

Rail Power Solutions (RPS), alongside our valued client Balfour Beatty, visited Beckton Depot today as part of the Beckton Depot Southern Sidings Expansion project.
A productive visit focused on understanding the depot layout, strengthening project relationships, and reinforcing our collaborative approach to delivery.

Easter marks a beautiful turning point in the year. A time for fresh starts and new perspectives. RPS wishing you a prod...
05/04/2026

Easter marks a beautiful turning point in the year. A time for fresh starts and new perspectives.
RPS wishing you a productive, peaceful, and joyful Easter break.

Saturday morning was well spent at Woking Substation.Collaborating with the Octavius Infrastructure team on:- Intrusive ...
18/03/2026

Saturday morning was well spent at Woking Substation.
Collaborating with the Octavius Infrastructure team on:
- Intrusive survey for DC cable connections.
- Temporary LV supply planning for the new modules.

All critical information was captured, ensuring the project remains on schedule for the next phase of design and installation.

A productive morning on site at High Brooms Railway Station, working with BAM UK & Ireland to identify the High Voltage,...
06/03/2026

A productive morning on site at High Brooms Railway Station, working with BAM UK & Ireland to identify the High Voltage, Pilot and Fibre Optic cable routes around the substation and car park area.
Positive cable identification is a key step in progressing the proposed Access for All (AFA) scheme, ensuring existing infrastructure can be safely understood and diverted where required.
Never a straightforward task when records are limited, but great teamwork and collaboration made solid progress.

RPS was delighted to host the Designplan Lighting team in our office. Their knowledge and insight into lighting and thei...
11/02/2026

RPS was delighted to host the Designplan Lighting team in our office. Their knowledge and insight into lighting and their product range provided valuable perspectives that may support our future design work. We appreciate the opportunity and look forward to potential work together.

25/12/2025

Merry Christmas from all of us at RPS

Rail Power Solutions, working alongside L.C. SWITCHGEAR LIMITED, has developed a bespoke 6kA CTS to act as a DC intercon...
24/12/2025

Rail Power Solutions, working alongside L.C. SWITCHGEAR LIMITED, has developed a bespoke 6kA CTS to act as a DC interconnector where a DC circuit breaker option is ruled out due to various constraints. RPS is leading product development and interface coordination for Cleshar, in collaboration with key stakeholders Network Rail and South Western Railway. Today’s Factory Acceptance Test of the new 6kA CTS marks an important milestone in the Fratton project, and we would like to thank everyone involved for their expertise, commitment, and collaborative approach throughout.

Another collaborative step forward today with the completion of topographical surveys and plate bearing tests at both Fr...
04/12/2025

Another collaborative step forward today with the completion of topographical surveys and plate bearing tests at both Fratton and Fareham. Plate bearing tests are crucial for assessing the soil's load-bearing capacity and settlement characteristics before the future delivery, installation, and commissioning of the new rectifier transformer and HV circuit breaker at Fratton Depot.

Great teamwork across all parties involved.

Address

164/180 Union Street
London
SE10LH

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

03330143894

Alerts

Be the first to know and let us send you an email when Rail Power Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Rail Power Solutions:

Shortcuts

Share