08/10/2026
Thursday, our team is on site in Forest Gate, E7, London, providing a 20m MEWP to support a major leak investigation and repair.
The platform is giving safe, controlled access to the affected elevation so the leak can be traced and fixed properly — without unnecessary disruption to the building.
When height access has to be reliable, a well-managed cherry picker makes the difference between a temporary patch and a lasting repair.
If you need MEWP hire or powered access in London, speak to KBN Platforms.
London ForestGate E7 WorkingAtHeight BuildingMaintenance KBNPlatforms