10/03/2026
At the end of last week, we successfully installed our stainless steel platform at one of our long-standing customers’ sites. As the production line was down for scheduled maintenance, it provided the perfect opportunity to carry out the installation.
The proofer previously had a door that exited onto a staircase, which has since been removed to allow double doors to be fitted for improved access to newly installed production lines. As a result, the door had been locked off from the inside, and the customer asked us to design and fabricate a new platform with a vertical access ladder to provide safe and practical access.
With limited space and restricted access, the team designed, fabricated, and installed the platform within the required timeframe.
Another great team effort all round.
If you think we could help you, please don't hesitate to get in touch.
📧 [email protected]
📞 07470136393
www.iesservice.co.uk