20/01/2026
Congratulations to The Erith Group Swanton Consulting Ltd Julian Malasi (and all other site management / subcontractors involved in this project).
Thank you for the opportunity for to demonstrate our expertises to complete the lifting of of 5 floor levels individually and combined per/level per operation to achieve total lift of approximately 3 metres - weighing/jacking force of 900 tonnes!! ๐ฏ
Summary of works:
โก๏ธ Operation 1: Lifting roof level
โก๏ธ Operation 2: Lifting roof level + level 4
โก๏ธ Operation 3: Lifting roof level + level 4, and level 3
โก๏ธ Operation 4: Lifting roof level + level 4, level 3 and level 2
โก๏ธ Operation 3: Lifting roof level + level 4, level 3, level 2 and finally level 1
Each operation doubled in weight and involved complexity for accuracy required; within 1-2mm per floor level to ensure final lift was with overall parameters of 7mm ๐ง
Using a combination of steelwork fabrication frames around existing columns, temporary propping to allow cutting free/supporting connections and a range of hydraulic cylinders (25, 30 and 50 tonnes capacity with 250mm upto 1000mm per/stroke cylinders)
Well done to everyone involved ๐๐๐
More details to follow
Contact Us:
๐ง E: [email protected]
๐ W: www.hydra-capsule.com
โ๏ธ T: +44 (0)1885 490 405