Hydra Capsule Limited

Hydra Capsule Limited Heavy Duty Jacking System Specailists. Ranging from hydraulic jacking, flat jacking, structural monitoring, jack hire, manufacturing and temporary propping

Hydra-Capsule Ltd was established in 1987. We soon gained a reputation for quality, safety and innovative solutions for the heavy lifting and sliding of structures using our own range of hydraulic jacks and specialist heavy lifting equipment developed from over 30 years of practical experience working on projects with the Highway Agency, Network Rail and London Underground to prestigious structure

s to become one of the UK leader jacking specialists within the civil and construction industry. Hydra-Capsule carry a large stock of fully tested hydraulic bridge jacks and hydraulic jacks for a range of jacking operation, available for contract services, jack hire and sales at competitive rates. Services, equipment and products include:

Temporary or Permanent Grout Flat jacks
Hydraulic Jacks โ€“ Service, Hire and Sales
Bridge Jacking and Sliding Systems
Hydraulic Jack Design, Testing and Manufacturing
Temporary Propping Systems - Contract Services, Hire and Sales
Monitoring Equipment for Jacking Operations and Structural Monitoring
Grout bags and Associated Equipment
Weighing and Load Testing
Pre-stressing and Tensioning. We always take pride in providing a professional and personal service to all our customers, maintaining good working relationships, giving helpful advice, technical support and on-site back up with all our products.

Congratulations to The Erith Group Swanton Consulting Ltd Julian Malasi (and all other site management / subcontractors ...
20/01/2026

Congratulations to The Erith Group Swanton Consulting Ltd Julian Malasi (and all other site management / subcontractors involved in this project).

Thank you for the opportunity for to demonstrate our expertises to complete the lifting of of 5 floor levels individually and combined per/level per operation to achieve total lift of approximately 3 metres - weighing/jacking force of 900 tonnes!! ๐Ÿ’ฏ

Summary of works:
โžก๏ธ Operation 1: Lifting roof level
โžก๏ธ Operation 2: Lifting roof level + level 4
โžก๏ธ Operation 3: Lifting roof level + level 4, and level 3
โžก๏ธ Operation 4: Lifting roof level + level 4, level 3 and level 2
โžก๏ธ Operation 3: Lifting roof level + level 4, level 3, level 2 and finally level 1

Each operation doubled in weight and involved complexity for accuracy required; within 1-2mm per floor level to ensure final lift was with overall parameters of 7mm ๐Ÿšง

Using a combination of steelwork fabrication frames around existing columns, temporary propping to allow cutting free/supporting connections and a range of hydraulic cylinders (25, 30 and 50 tonnes capacity with 250mm upto 1000mm per/stroke cylinders)

Well done to everyone involved ๐Ÿ‘๐Ÿ‘๐Ÿ‘
More details to follow

Contact Us:
๐Ÿ“ง E: [email protected]
๐ŸŒ W: www.hydra-capsule.com
โ˜Ž๏ธ T: +44 (0)1885 490 405

15/01/2026

โฐ Throwback Thursdayโ€ฆ.

Synchronised lifting, hydraulic jacking and temporary works scheme used to lift +15,000te (jacking force) โ€˜long curved box tunnelโ€™ first time in UK.

โ€œVideo can tells a thousand wordsโ€

Hydra-Capsule Limited offered a full contract package from assisthg supply & fix to lift/guide and integrated wireless and monitoring system - to deliver an โ€œone-stop solutionโ€

โœ… 68no. Hydraulic 400te x 100/150mm stroke cylinders - locking collars - for preloading/lifting and load distribution (through launch skid-beams)
๐Ÿ”ณ 40no. Hydraulic 200te x 150mm Hollow Hole and Solid Double-Acting Cylinders - to horizontally guide and control launc direction
โžก๏ธ Lifting & Prelaoding across 155 metres long structure for 140 metres in preparation for hydraulic launch - in controlled manner
โœ… Fully-linked and individual control points for all locations with full movement and load monitoring per operation
๐Ÿ”ณ Accuracy of +/- 2mm throughout works
โžก๏ธ All equipment, design input and specialised engineers supplied โ€œin-houseโ€

Disclaimer: the push/launch and slide operation was completed by others

๐Ÿ‘ Once completed - the structure permanent supports were installed and load-transfer completed

Synchronised TemporaryWorks Cylinders HydraulicJacking HeavyLifting ConcreteBoxSectionSlide Skidding Launching HydraulicSlidding MegashorPacks Hydraulics FlatJacking Hire Engineering megashor slimshor temporarypropping propping GivingConstructionOurSupport hydracapsulelimited

Works:Hydra-Capsule Limited engineers carried out temporary propping and needling systems to assist demolition of load-b...
13/01/2026

Works:
Hydra-Capsule Limited engineers carried out temporary propping and needling systems to assist demolition of load-bearing walls and load-transfer using permanent grout-filled flat jacks and hydraulic jacks for steelwork preloading

Allowing for quick response and turnaround to ensure the customer and carry on with works for demoliton and strengthening

Equipment Used:
โžก๏ธ 78no. Twin-Needles Support - using 4.1 and 5.5m propping lengths
โžก๏ธ 8no. Propping Locations - 21 tonnes of equipment with each leg capacity of superslim providing out 15 tonnes per/section
โžก๏ธ Bespoke and standardised steelwork spreader (upto 7 metre long) and spreader/header beams
โžก๏ธ 12no. Hydraulic cylinders - 30 tonnes capacity each
โžก๏ธ 18no. Permanent Flat Jacks - 20 tonnes capacity each

Offering a โ€œone-stopโ€ package - our engineers were able to incorporate easy-to-assemble/versatile system to accelerate installation safely, and cost-saving - www.hydra-capsule.com

๐Ÿ“ž Contact Us Today to find out how we can support your next project:

โ˜Ž๏ธ Tel: +44 01885 490
๐Ÿ“ง Email: [email protected]
๐ŸŒ Visit: www.hydra-capsule.com

Letโ€™s build the future together! ๐Ÿ—๏ธ Giving Construction Our Support ๐Ÿšง๐Ÿฆบ

jackup cylinders flatjacking construction backpropping temporarypropping demolition preloading steelwork givingconstructionoursupport

05/01/2026

Good morning ๐ŸŒ… โ€ฆletโ€™s give a welcome to Jackโ€ฆ.

Our newest member of - he will be making monthly updates on his journey through temporary propping and hydraulic jacking industry - letโ€™s see what he has in store for 2026 ๐Ÿ’ฏโœ…๐Ÿ™Œ

heavylifting skidding sliding cylinders givingconstructionoursupport flatjacking steelwork demolition propping cranesgrillages torquing

23/12/2025

We would like to wish all our employees, customers and contractors a Merry Christmas and Happy New Year!!

2025 has been a phenomenal year with numerous successful projects, huge investments from everyone (customers, colleagues and suppliers)

Thank you for your continued support and we look forward to 2026 being yet another year of success and more great innovation solutions to be demonstrated from Hydra-Capsule Limited and Allen Hydraulic Engineering Limited (AHE)

๐Ÿšจ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐”๐ฉ๐๐š๐ญ๐ž ๐Ÿšจ completed preloading and torquing/prestressing of TC-2 and TC-4 tower-crane grillages. Using a combin...
11/12/2025

๐Ÿšจ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐”๐ฉ๐๐š๐ญ๐ž ๐Ÿšจ
completed preloading and torquing/prestressing of TC-2 and TC-4 tower-crane grillages.
Using a combination of hydraulic jacks, hollow ram and bolt tensioning equipment for tensioning steel crane-grillage

Equipment Supplied:
โœ… 16x. High tensile dywidag 47mm diameter tension bars, anchors and fixtures/fitting
โœ… 02x. Preloading of 520 tonnes of tension and stressing on bolting sequence (16nr bars)
โœ… 01x. Digital and wireless monitoring system - for recording load, movement and bar elongation readings
โœ… 04x. Bespoke jacking frames/beams due to bar installation error and temporary works proposal

Fantastic effort from all parties to achieve critical deadline on a 24 hours window - to ensure towed crane installation will go ahead ๐Ÿ‘ www.hydra-capsule.com

Contact Us:
๐Ÿ“ง E: [email protected]
๐ŸŒ W: www.hydra-capsule.com
โ˜Ž๏ธ T: +44 (0)1885 490 405

03/11/2025

๐Ÿšง Project progress preview.. ๐Ÿšง

A few weeks agoโ€ฆ undertook a high risk heavy-lifting and hydraulic jacking activity on the edge of Mayfair high streets.

Unknown to the public and surrounding areas - behind the hoarding and protection fencing - we were able to safely and complete a controlled synchronised lift of an entire facade wall (that had been temporary supported and cut free) to allow lifting of this superstructure ๐ŸŒ‰๐Ÿ—๏ธ

Successfully competing this project in less than 8 hoursโ€ฆ. Using a combination of 150te, 200te hollow ram cylinders and synchronised lifting + wireless monitoring systems

The facade was lifted approximately 5 metres โฌ†๏ธ from its starting point and securely fixed to its new final position - more news to follow

Looking forward to the Timelapse and filming of this unique project and operation being completed successfully - well done to our team ๐Ÿ‘๐Ÿ‘ - once again working professionally, and safely to ensure porjects are delivered and competently

Allen Hydraulic Engineering Limited (AHE)

Just wow!! & well done to my team - just exceeding expectations week after weeks ๐Ÿ‘๐Ÿ‘Maybe words donโ€™t explain the complex...
27/10/2025

Just wow!! & well done to my team - just exceeding expectations week after weeks ๐Ÿ‘๐Ÿ‘

Maybe words donโ€™t explain the complexity involved and equipment developed, supplied and installed from our teams on-site; whilst all the other on-going projects aswellโ€ฆ so a few pictures belowโ€ฆ

โ€œphotos tells a thousand wordsโ€

core company values and structure, ensures a full contract package from initial concept to assisting design(s), supply & fix to completion - with a full project support and management behind the scheme, to deliver an โ€œone-stop solutionโ€

Phase 1 summary (with Phase 2 and 3 to follow):

โœ… 544no. Hydraulic Jacking location
๐Ÿ”ณ 1122no. Temporary propping locations
โžก๏ธ Lifting of 5 levels - average region of 565mm to 1485mm covering 35,000 sq ft/m of slab/steelwork and support system
โœ… Fully-linked and individual control points upto 128no locations with full movement and load monitoring per operation
๐Ÿ”ณ Accuracy of +/- 2mm throughout works
โžก๏ธ All equipment, design input and specialised engineers supplied โ€œin-houseโ€
๐Ÿ‘ Total weight +1,350 tonnes

Allen Hydraulic Engineering Limited (AHE)

 - Giving Construction Our Support!Using a traditional โ€œJack and Packโ€ solution (climbing jacks) - ideal for low height ...
22/10/2025

- Giving Construction Our Support!

Using a traditional โ€œJack and Packโ€ solution (climbing jacks) - ideal for low height access and insertion constraints!

Equipment used
โœ… 8no. 200 tonnes x 150mm stroke cylinders
โœ… 28no. 250 tonnes x 100 & 150mm stroke cylinders
โœ… 28no. 250 tonnes x 50mm stroke cylinders
โœ… 260no. Jacking packs and plates (+9.5 tonnes)
โœ… 800no. metres(0.8 miles) of hydraulic hosing
โœ… 28no. Wireless movement and load monitoring system
โœ… 02no. 28-way synchronised pumping system

Sean Davies

20/10/2025

Lifting superstructures seem to be more a daily than a weekly occurrenceโ€ฆ this bridge needed modification works for an up and coming project

Hydra-Capsule were approached with a scheme of lifting approximately +160mm to allow access and safe working space - however - sometimes projects requirements and constraints changeโ€ฆ.

The final heavy lifting operation achieved = +260mm approximately across this +100 metres long bridge deck, weighing in excess of 750 tonnnes.

Equipment supplied
โœ… 30no. 250 tonnes x 45mm stroke screw rams cylinders
โœ… 30no. 250 tonnes x 100mm stroke screw rams cylinders
โœ… 02no. 16-way Synchronised PowerPack pumps
โœ…. 30no. Point control, movement and load monitoring sensors
๐Ÿ”ณ +400no. 40mm packing and jacking plates
๐Ÿ”ณ +700no. Metres (0.7 miles) of hydraulic hosing

System implemented:
โ–ช๏ธ 28no. Synchro-lift
โ–ช๏ธ 56no. Hydraulic locking collar cylinders
โ–ช๏ธ Jack and pack system (climbing jack operations)

Once the remedial works are completed the superstructure will then be fully lowered/load-tranaferred onto the modified supports for the next phase of workstation

Hydra Capsule Limited

โฑ๏ธ ๐„๐Ÿ๐Ÿ๐ข๐œ๐ข๐ž๐ง๐ญ ๐„๐ฑ๐ž๐œ๐ฎ๐ญ๐ข๐จ๐ง ๐Ÿ So hereโ€™s a good few photos of recent hydraulic jacking and temporary works schemes we have bee...
14/10/2025

โฑ๏ธ ๐„๐Ÿ๐Ÿ๐ข๐œ๐ข๐ž๐ง๐ญ ๐„๐ฑ๐ž๐œ๐ฎ๐ญ๐ข๐จ๐ง ๐Ÿ

So hereโ€™s a good few photos of recent hydraulic jacking and temporary works schemes we have been on lately.

My favourite and enjoyable projects are always being able to see things move and lift - but recently we had pleasure (from hire fleets) in supplying the below cylinders on a number of projects:

12no. 1600 tonnes locking collar cylinders
08no. 800 tonnes locking collar cylinders
26no. 360-400 tonnes locking collar cylinders
52no. 100 and 160 tonnes locking collars cylinders
26no. 110 tonnes x 150mm screw ram cylinders
88no. 30 tonnes x 250mm double acting cylinders
40no. Hydraulic hand pumps c/w gauges
35no. PowerTeam Vanguard Hydraulic PowerPacks (Allen Hydraulic Engineering Limited (AHE))

Massive congratulations to our warehouse and maintenance workshop teams for all the inspection, testing and delivery of all these products to site on time and brilliant condition ๐Ÿ‘

Contact Us:
๐Ÿ“ง E: [email protected]
๐ŸŒ W: www.hydra-capsule.com
โ˜Ž๏ธ T: +44 (0)1885 490 405

10/10/2025

๐Ÿ—๏ธ Project Case Study ๐Ÿ“ฝ

Mayfair Refurbishment โ€“ Hydraulic Jacking and Temporary Propping Supports to enable separation of concrete floors for lifting and strengthening works

Using our โ€œin-house builtโ€ synchronised lifting solution to achieve 1180mm (1.2metres) by using a simple โ€˜jack and packโ€™ solution within 1.5 hours - now we leave the specialists to reconnect newly installed permanent steelwork connections for the new floor heights

Hydra-Capsule were contracted to undertake the following scope:

โœ… Assisting Temporary Works Design and Early Contractor Involvement (ECI) to develop a robot solution for the applications
โžก๏ธ Supply and Installation of fully automated and controlled synchronous heavy-lifting control system
โœ… Stage 1 - preloading all temporary works and propping to enable โ€œcutting freeโ€ all supports for the suspended floor deck
โžก๏ธ Stage 2 - balancing loads and ensuring level of the structure is maintained within +/- 1mm
โœ… Supply and Installation of all the hydraulic cylinders, temporary propping across 10no. floor levels
โžก๏ธ Accuracy of 2mm tolerance for steelwork installation
โœ… Full โ€˜one-stopโ€™ solution to guarantee professional deliveries

Contact Us:
๐Ÿ“ง E: [email protected]
๐ŸŒ W: www.hydra-capsule.com
โ˜Ž๏ธ T: +44 (0)1885 490 404

Hydra Capsule Limited

Address

Hydra Works Depot/Unit 13
Hereford
HR12UA

Opening Hours

Monday 7:30am - 5:45pm
Tuesday 7:30am - 5:45pm
Wednesday 7:30am - 5:45pm
Thursday 7:30am - 5:45pm
Friday 7:30am - 4:45pm
Saturday 7:30am - 2pm

Telephone

01885490405

Alerts

Be the first to know and let us send you an email when Hydra Capsule Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share