Four Tees Engineers Ltd.

Call Directions Website

Four Tees Engineers Ltd. Four-Tees Engineers are Steelwork Specialists.

From Year 10 work experience to a Civil Engineering Degree Apprenticeship - Cameron Hendy’s journey with Four-Tees Engin...
15/10/2026

From Year 10 work experience to a Civil Engineering Degree Apprenticeship - Cameron Hendy’s journey with Four-Tees Engineers is taking an exciting next step.

Our Project Assistant has begun his degree apprenticeship at the University of Portsmouth, combining one day a week at university with four days working on FTE projects.

Since joining in March, Cameron has gained hands-on experience across project support, estimating, design processes, document control and fabrication. It reflects FTE’s commitment to giving apprentices broad exposure to our Intelligent Integration approach, helping them connect academic learning with real-world engineering and project delivery.

Read Cameron’s story and learn more about how FTE is supporting the next generation of engineers: https://ow.ly/WNYa50ZXTUs

​

A structural steelwork design can meet the required standards and still prove difficult - or costly to build.The problem...
28/09/2026

A structural steelwork design can meet the required standards and still prove difficult - or costly to build.

The problems may only become visible during fabrication or installation: a connection that is hard to access, a weld that takes longer than expected, or a delivery sequence that does not work on site. By then, time and money have already been committed.

In our latest article, Four-Tees Engineers looks at the hidden costs of poor design and why bringing site surveys, design, fabrication and installation together from the outset makes such a difference.

Read the article: https://ow.ly/wss250ZS7Lg

Repeated bridge strikes at Brighton Road Bridge created a clear need for a permanent solution - one that would protect a...
24/09/2026

Repeated bridge strikes at Brighton Road Bridge created a clear need for a permanent solution - one that would protect a vital rail structure while reducing disruption for rail passengers and road users.

Working for SRE Volker Fitzpatrick and Network Rail Four-Tees Engineers detailed, fabricated and installed two substantial collision protection beams, measuring 26.3m and 24.6m long.

Proactive design reviews, accurate as-installed surveys and flexible fabrication decisions helped resolve emerging issues before installation, supporting a first-time fit during the rail blockade.

Our latest case study explores how FTE used recycled steel, specialist pre-cambering and integrated design, fabrication and installation to deliver a resilient, future-ready solution.

Read the full case study here: https://ow.ly/qGcH50ZPJi3

Upgrading rooftop and street-level telecoms structures brings complex challenges: higher equipment loads, restricted acc...
17/09/2026

Upgrading rooftop and street-level telecoms structures brings complex challenges: higher equipment loads, restricted access, live environments, lifting operations and the need to minimise disruption in busy urban locations.

In our latest article, Four-Tees Engineers explores how integrated survey, design, fabrication and installation can help reduce risk when delivering rooftop frames, load-spreading grillages, platforms and street-level structures for evolving telecoms networks.

Read the full article: https://ow.ly/oUs950ZOH09

Major bridge-strengthening programmes demand more than specialist steelwork. They require a joined-up approach that can ...
10/09/2026

Major bridge-strengthening programmes demand more than specialist steelwork. They require a joined-up approach that can manage unknowns, respond quickly to emerging issues and maintain certainty around safety, quality, cost and programme.

In our latest article, Four-Tees Engineers shares three examples of Intelligent Integration in practice: delivering more than 900% of additional repairs at Borough Market; supporting the emergency response at Nuneham Viaduct; and completing major strengthening works at Lymington Viaduct, including more than 4,600 individual components.

Read how integrated inspection, design, detailing, fabrication and installation can reduce risk and keep complex bridge-strengthening projects moving: https://fourtees.co.uk/a-trusted-partner-for-major-steelwork-bridge-strengthening/

Four-Tees Engineers is proud to have supported the successful delivery of major engineering works at London Charing Cros...
03/09/2026

Four-Tees Engineers is proud to have supported the successful delivery of major engineering works at London Charing Cross and Waterloo East during the 22-day blockade, which enabled a £20 million programme of track, platform and structures upgrades.

Working alongside the SRE Volker Fitzpatrick team, FTE rapidly mobilised specialist project management and skilled installation teams to provide additional delivery capacity. Our work included platform litter-screen installation, steelwork completion around footbridge staircases and lift shafts, and repairs to footbridge cladding.

With more than 2,160m² of platform infrastructure renewed, 540 tonnes of existing material removed and around 90 tonnes of new steelwork installed, the blockade has helped strengthen Charing Cross for the future.

Read the full story here: https://ow.ly/bStU50ZIhH4

Network Rail

Framework success depends on more than delivering individual packages of work. It relies on design, fabrication and inst...
25/08/2026

Framework success depends on more than delivering individual packages of work.

It relies on design, fabrication and installation being connected from the outset - so risks are identified early, interfaces are managed and delivery remains focused on the outcomes that matter.

In our latest article, Four-Tees Engineers explores how integrated structural steelwork design can help safeguard programme, cost, quality and whole-life performance across framework delivery.

Read the full article here: https://ow.ly/9qfv50ZCqIs

The transition to electric buses and eHGVs needs charging infrastructure that can evolve with operational needs, vehicle...
11/08/2026

The transition to electric buses and eHGVs needs charging infrastructure that can evolve with operational needs, vehicle technology and future demand.

In our latest article, Four-Tees Engineers explores how an integrated approach to structural design, fabrication and installation can help create practical, adaptable infrastructure for a lower-carbon transport network.

Read the full article here: https://ow.ly/EptI50ZxFo5

Four-Tees Engineers understands that every marine project brings new constraints, challenges and opportunities to improv...
04/08/2026

Four-Tees Engineers understands that every marine project brings new constraints, challenges and opportunities to improve the way we deliver.

Our latest article looks at how translating learning and best practice into every new marine project helps strengthen planning, improve buildability and support safer, more efficient delivery across changing site conditions and project requirements.

Read the full article here: https://ow.ly/ymKV50ZvQHh

A major milestone on a complex rail infrastructure project. Four-Tees Engineers is proud to share the story behind what ...
30/07/2026

A major milestone on a complex rail infrastructure project. Four-Tees Engineers is proud to share the story behind what is probably the largest rail bridge protection beam install in the UK, delivered in collaboration with Network Rail, SRE and Volker Fitzpatrick.

Special thanks also go to our key suppliers: Angle Ring, Baypoint Surveyors, Cleveland Steel & Tubes Ltd, Marsh Plant Hire, PPC Transport and Fullpen Fabrication, whose support helped make the delivery of this challenging scheme possible.

Read the full article here: https://ow.ly/ankq50Zu9q5

Address

1 Dewar Close
Fareham
PO155UB

Opening Hours

Monday 7:30am - 6pm
Tuesday 7:30am - 6pm
Wednesday 7:30am - 6pm
Thursday 7:30am - 6pm
Friday 7:30am - 5pm

Telephone

01489 885899

Alerts

Be the first to know and let us send you an email when Four Tees Engineers Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share