PB Fabrications

Well done yet again Hayden , hoping to take a drive over this week and watch you mate
08/09/2026

Well done yet again Hayden , hoping to take a drive over this week and watch you mate

05/09/2026

Hi ,
Would anyone have 9 x 2” schedule 40 carbon weld neck flanges I could
Buy off them Asap ?

Local to NN171ET

New pressure relief valve and pipework installed today at a new site I’ve been working .
15/07/2026

New pressure relief valve and pipework installed today at a new site I’ve been working .

Well done Hayden mate
10/07/2026

Well done Hayden mate

Hope you had a good weekend
29/06/2026

Hope you had a good weekend

It’s race day 1 here at Pembrey.

Warm up completed and just about to go out for qualifying.
Race 5 of the day. Timing can be found: https://livetiming.tsl-timing.com/262628

2 new coils and stainless pipework on a food production sterilisation unit .We have another one to start this week .
20/05/2026

2 new coils and stainless pipework on a food production sterilisation unit .

We have another one to start this week .

Well done mate .
16/05/2026

Well done mate .

Round 2 , and with a new class to race in about a new bike , he secured a 4th place in race 3 .Full report coming soon
20/04/2026

Round 2 , and with a new class to race in about a new bike , he secured a 4th place in race 3 .

Full report coming soon

Race day 2 done and dusted!

warm up-p7, tried some new gearing and very cold track so didn’t want to push hard before the races.

race 2- p7, tried another gearing which was way better, pulled a huge gap however on the last lap coming into park corner i had a false neutral which allowed the rider behind to catch up big time and make a move on me into mansfield, nearly a photo finish however just got pipped at the line.

race 3- p4, an amazing race, after a poor start having to avoid another rider nearly flipping it on the line i dropped abit of time on the run to turn one however as the race went on i managed to catch and overtake a few riders and after a few crashes and a red flag i managed to take her home in p4.

really good end to the weekend with times improving each session and having a better understanding of the bike now. full race report to follow soon❗️

📸- Adrenaline & Aperture

. A selection of photos from various projects completed and started over the past couple of months.Alongside this, I’ve ...
19/04/2026

. A selection of photos from various projects completed and started over the past couple of months.

Alongside this, I’ve nearly completed the replacement of all condensate pipework on eight autoclaves for a new customer totalling approximately 600 welds in 2” and 3” carbon schedule 40 pipe.

Looking ahead:

* In April/May, we’re scheduled to carry out sectional modifications on several large slurry tanks.

* We’ve recently submitted a quote for a project involving 3” stainless steel pipework and the installation of new safety valves.

* Another upcoming job involves replacing 8” and 10” PN40 flanged spools, covered under my recently approved weld procedures.

* Next week, I’ll be installing a new control valve along with 3” hygienic pipework for a regular customer.

* I’ve also begun assembling pipework for two heat exchangers in the workshop. Once completed and approved, these will be installed on-site, with the same scope to be replicated across two additional sterilisation units.

As always, I have a dependable and experienced team available to support any additional work requirements.

11/04/2026

Does anybody know of any work shop units to rent in the Peterborough and surrounding areas ?

Address

Corby
NN171ET

Alerts

Be the first to know and let us send you an email when PB Fabrications posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share