PB Fabrications

2 new coils and stainless pipework on a food production sterilisation unit .We have another one to start this week .
20/05/2026

2 new coils and stainless pipework on a food production sterilisation unit .

We have another one to start this week .

Well done mate .
16/05/2026

Well done mate .

Round 2 , and with a new class to race in about a new bike , he secured a 4th place in race 3 .Full report coming soon
20/04/2026

Round 2 , and with a new class to race in about a new bike , he secured a 4th place in race 3 .

Full report coming soon

Race day 2 done and dusted!

warm up-p7, tried some new gearing and very cold track so didn’t want to push hard before the races.

race 2- p7, tried another gearing which was way better, pulled a huge gap however on the last lap coming into park corner i had a false neutral which allowed the rider behind to catch up big time and make a move on me into mansfield, nearly a photo finish however just got pipped at the line.

race 3- p4, an amazing race, after a poor start having to avoid another rider nearly flipping it on the line i dropped abit of time on the run to turn one however as the race went on i managed to catch and overtake a few riders and after a few crashes and a red flag i managed to take her home in p4.

really good end to the weekend with times improving each session and having a better understanding of the bike now. full race report to follow soon❗️

📸- Adrenaline & Aperture

. A selection of photos from various projects completed and started over the past couple of months.Alongside this, I’ve ...
19/04/2026

. A selection of photos from various projects completed and started over the past couple of months.

Alongside this, I’ve nearly completed the replacement of all condensate pipework on eight autoclaves for a new customer totalling approximately 600 welds in 2” and 3” carbon schedule 40 pipe.

Looking ahead:

* In April/May, we’re scheduled to carry out sectional modifications on several large slurry tanks.

* We’ve recently submitted a quote for a project involving 3” stainless steel pipework and the installation of new safety valves.

* Another upcoming job involves replacing 8” and 10” PN40 flanged spools, covered under my recently approved weld procedures.

* Next week, I’ll be installing a new control valve along with 3” hygienic pipework for a regular customer.

* I’ve also begun assembling pipework for two heat exchangers in the workshop. Once completed and approved, these will be installed on-site, with the same scope to be replicated across two additional sterilisation units.

As always, I have a dependable and experienced team available to support any additional work requirements.

11/04/2026

Does anybody know of any work shop units to rent in the Peterborough and surrounding areas ?

We have recently started phase 2 on these 8 autoclaves .This project which we started in January was to replace all the ...
03/04/2026

We have recently started phase 2 on these 8 autoclaves .

This project which we started in January was to replace all the condensate return pipework on all 8 autoclaves including a block and bleed double isolation set up on each autoclave.

The work should be completed in may and then we move on to some other projects that are in the pipeline.

Hayden’s first race at brands hatch .This was to be his first time racing at  this circuit  and the first time riding hi...
23/03/2026

Hayden’s first race at brands hatch .

This was to be his first time racing at this circuit and the first time riding his new bike competitively,

He’s only had the bike a few months so there’s been little time to get some practice on it .

He had a good weekend with his best result being 6th in class.

The next round is at cadwel park .
Good luck son .

First round of the NGRRC series onboard my Kawasaki ninja 400 at brands hatch Indy circuit. A weekend full of ups and downs and huge learning curves, onto th...

Short shift in the workshop today getting some steam pipes welded up for installation on Wednesday.A total of 62 butt we...
01/03/2026

Short shift in the workshop today getting some steam pipes welded up for installation on Wednesday.

A total of 62 butt welds have been completed for the next installation.

These have been done on my turntable for speed and ease .

Root to cap , 2.4 mm gap wire .

Second batch of steam pipework now underway for a new customer.PB fabrications is still as busy as ever and although it ...
05/02/2026

Second batch of steam pipework now underway for a new customer.

PB fabrications is still as busy as ever and although it would be nice to have a quiet period I have to remind myself how hard I’ve work to get here , to be home every night and not travelling all over the country living in hotels .

So we will continue to keep our customers happy and keep churning the work out .

Let the season commence…🥇 🏍️ 🏆 Hayden West  #37
24/01/2026

Let the season commence…
🥇 🏍️ 🏆 Hayden West #37

Address

Corby
NN171ET

Alerts

Be the first to know and let us send you an email when PB Fabrications posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share