Southeast Marine Engineering Ltd

Southeast Marine Engineering Ltd Marine & General Steelwork
Dry docking
Shot Blasting
UHP water blasting
Painting
New build houseb

Said goodbye to Charlotte Joan this afternoon after a top to bottom UHP blast and repaint, top half of the wheelhouse is...
09/05/2026

Said goodbye to Charlotte Joan this afternoon after a top to bottom UHP blast and repaint, top half of the wheelhouse is next years job as the windows need removing to do a proper job so this just got a quick coat to look fresh for the season.

Very challenging conditions on this one, with a consistent NE wind and dewy mornings, we managed to muddle on and the result speaks for itself.
There was around 80 layers of paint removed at a weight of approximatly 2 ton.

Splitmoor on the slip this afternoon.
04/02/2026

Splitmoor on the slip this afternoon.

New stainless steel skeg fabricated. The rudder pintel was badly worn so removed the worn out one, machined a new pintel...
07/06/2025

New stainless steel skeg fabricated. The rudder pintel was badly worn so removed the worn out one, machined a new pintel and welded back in.

323mm piles. 12, 12m lengths extended to 15m on a super quick turn around.
07/06/2025

323mm piles. 12, 12m lengths extended to 15m on a super quick turn around.

Composite gate and infill panel recently fabricated and installed
07/06/2025

Composite gate and infill panel recently fabricated and installed

Had the Vulcan in for a quick Pitstop last week.Blasted both hulls and repainted with epoxy primer tie coat and seaforce...
13/05/2025

Had the Vulcan in for a quick Pitstop last week.
Blasted both hulls and repainted with epoxy primer tie coat and seaforce 90 antifoul. New anodes fitted and trim tabs fitted aswell

Stainless exhaust water jacket repair
16/04/2025

Stainless exhaust water jacket repair

New office sign we designed on CAD then had it laser cut from 4mm mild steel.
16/04/2025

New office sign we designed on CAD then had it laser cut from 4mm mild steel.

Diesel tank fabricated last week
16/04/2025

Diesel tank fabricated last week

HF11 flattop repairs recently completed. Cropped out the collapsed deck plate, frames and transom plate. New frames with...
16/04/2025

HF11 flattop repairs recently completed.
Cropped out the collapsed deck plate, frames and transom plate. New frames with larger gussets and compression posts internally then finished off with 10mm plate to transom and deck

Address

Chattenden
ME39LB

Opening Hours

Monday 6am - 6am
Tuesday 6am - 6am
Wednesday 6am - 6am
Thursday 6am - 6am
Friday 6am - 5pm
Saturday 6am - 1pm
Sunday 6am - 1pm

Telephone

07538080502

Alerts

Be the first to know and let us send you an email when Southeast Marine Engineering Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Southeast Marine Engineering Ltd:

Share