18/03/2025
Towards the back end of 2022, ARX Security were approached by the Football Association (FA) to open discussions on the feasibility of designing and supplying a Surface Mount, Temporary Fence System with a crowd load rating of 3kN on all aspects that would form a Fan Zone on the east concourse of the Wembley Stadium.
We are very proud to be associated with England’s National Stadium and would like to thank everybody from the FA that was involved for their trust and their support during this project.
Despite this being a purpose built fan zone, just for this project, the 3kN crowd loading certification can be utilised into any project, for any area and was designed in accordance with:
BS EN 1990-1-1:2002 - Basis of structural design
BS EN 1993-1-1:2005 - Design of steel structures
BS EN 1991-1-4:2005 and NA - Wind actions
BS EN 1997-1:2004 - Geotechnical design
Guide to Safety at Sports Grounds 'Green Guide' 6th Edition.
Please contact our sales team to discuss any requirements you may have for similar projects.
T. +44(0)1332 814080
E. [email protected]
W. www.arxuk.co.uk