07/10/2026
Recent works carried out by our engineers to replace a customerโs ageing water supply pipe. A narrow trench was excavated to installl the 32mm MDPE water supply pipe. As always when undertaking trench works, a 63mm protective duct was installed to completly future proof the supply, preventing any future issues regarding ground conditions.