10/08/2026
Concrete base for sauna. Area graded off to level out, shuttering constructed, DPM membrane and concrete laid. 2 sandstone slabs laid to match exsisting slabs around pool area. Shuttering will be removed once concrete is set.. stay tuned to see the sauna in place. 🧖🏼♀️ 🏊 🌊