Fusion Electrical & Civils

Fusion Electrical & Civils Electrical & Civil Engineering, fibre optics, digging ,building maintenance & EV chargers

Tarmac patch repairs & thermoplastic lining works carried out by the Fusion Team at Kwik fit Dunfermline
31/03/2026

Tarmac patch repairs & thermoplastic lining works carried out by the Fusion Team at Kwik fit Dunfermline

Electrician Vacancy - Due to increasing electrical work loads - Fusion are looking for a time served Electrician, this i...
24/02/2026

Electrician Vacancy - Due to increasing electrical work loads - Fusion are looking for a time served Electrician, this is a full time position with a good rate of pay, you will be teamed up with an experienced 3rd year apprentice & would be carrying out various electrical work in and around the central belt, there is some out of hours over time works available on some of our contracts from time to time, Company vehicle.
Anyone interested please call me on 07511523964 or Message/whatsap msg me, alternatively you can email your CV/application to: [email protected]

Our works at Warburtons Newcastle concluded this week, our repairs on site included: -• Breaking out old cracked concret...
21/02/2026

Our works at Warburtons Newcastle concluded this week, our repairs on site included: -
• Breaking out old cracked concrete areas & removed all broken out waste from site
• Repairing drainage & resetting gullies for the new falls
• Stoning up with new sub base to areas that had subsided
• Laying new binder course
• planing out a large area of the existing yard wearing course that was old & the bitumen was heavily oxidised
• Re-surfacing a large repair area with a new structural high stone content HRA wearing course - specifically designed for HGV’s & high volume traffic
• thermoplastic lining to new bays for the new
Gluten line delivery Lorrie’s to be loaded on & also creating a new walkway for the Gluten plant operatives to safely get from the staff carpark to the new Gluten production line

This project required the synergy of Fusion & Macrete working together to achieve a common goal - with good overlap of works and absolutely no downtime - the project was completed in only 5 days!

Driveway completed this week at newton mearns, Tobermore Shannon block with a granite set border & planters - topiary ba...
18/02/2026

Driveway completed this week at newton mearns, Tobermore Shannon block with a granite set border & planters - topiary balls & gravel still to be added to the planters, tar footpath was also repaired by Fusion
Call us for a quote📞 01236767665

7.2kw EV charger & double ip 65 external socket installation at Coatbridge
15/02/2026

7.2kw EV charger & double ip 65 external socket installation at Coatbridge

Drainage repairs carried out at a Morrisons store in Glasgow
15/02/2026

Drainage repairs carried out at a Morrisons store in Glasgow

Fusion’s Electrical division are currently in the middle of re-wiring a live fire station in Fife, all new MCCB supply e...
14/12/2025

Fusion’s Electrical division are currently in the middle of re-wiring a live fire station in Fife, all new MCCB supply equipment & supply cables + all new distribution boards are now in place - works are running smoothly & we are on schedule to finish on time, the client is happy with our work & the team are doing a great job!

Fusions Street lighting team continues to push these works on to completion in the next few weeks!
27/11/2025

Fusions Street lighting team continues to push these works on to completion in the next few weeks!

27/11/2025

2200m of trenching/ ducting cabling + reinstatement works on footpaths , paving slabs, soft areas, also installation of earth mats

One of the Fusion ground works teams are carrying out Permeable block paving yard extension works at East Kilbride
20/11/2025

One of the Fusion ground works teams are carrying out Permeable block paving yard extension works at East Kilbride

Fusion were involved in High school lifecycle works during recent school holiday shut down - areas of deteriorated mono ...
06/11/2025

Fusion were involved in High school lifecycle works during recent school holiday shut down - areas of deteriorated mono block were replaced in various school car parks throughout the central belt.
The O&M details of the block were made available to us by the Principal Contractor which made ordering the correct blocks painless!

Address

Main Street
Airdrie
ML69SG

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 3pm

Telephone

+441236767665

Alerts

Be the first to know and let us send you an email when Fusion Electrical & Civils posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fusion Electrical & Civils:

Share