💊 Pill 2 / 3 – How to identify the right time on site
On-site, the start of the troweling process should be based on observation, not on the clock. There are three simple and reliable checks.
1️⃣Footprint test. Walk carefully on the slab:
- Footprint of 3–5 mm: correct timing
- Deep footprint: too early
- No visible footprint: too late
2️⃣ Bleeding water observation. After screeding, water rises to the surface:
- As long as water is visible, do not start troweling
- The correct moment is when the surface becomes matte and uniform
3️⃣ Surface behavior. Key indicators:
- Finger leaves a light mark without sinking
- Surface is not sticky
- Slight resistance when scratched
✅When these three conditions are met, troweling can begin safely.