Egypt Engineering Services Company S.A.E. (EGYPTROL)

  • Home
  • Egypt
  • Cairo
  • Egypt Engineering Services Company S.A.E. (EGYPTROL)

Egypt Engineering Services Company S.A.E. (EGYPTROL) EGYPTROL specializes in providing engineering and commissioning services for electrical power genera

EGYPTROL was launched 1998 providing electrical and control systems engineering services to foreign contracting firms operating in Egypt, utilizing available Egyptian individuals’ experiences. The name EGYPTROL was an acronym for “EGYPT CONTROL Systems”. In 2008, the company took a strategic move to specialize on the following fields of services:
- Engineering and commissioning of electrical pow

er generation and substation systems.
- MEP (Mechanical, Electrical and Plumbing) engineering design services for industrial, commercial and real-estate projects. In 2010, the MEP engineering design team was the nucleus to start our affiliate company “E Consult” www.econsult-eg.com. Meanwhile, EGYPTROL continued on providing customers with design engineering, testing and commissioning services for power plants and substation projects. We have a long record of successfully completed projects through Egypt, Middle East and Gulf area.

The Economic Advantages of Gas ConversionConverting an existing power plant from liquid fuel — HFO or diesel — to natura...
10/09/2026

The Economic Advantages of Gas Conversion

Converting an existing power plant from liquid fuel — HFO or diesel — to natural gas can deliver substantial economic benefits. But the real value goes well beyond the fuel price difference.

Lower fuel costs. Reduced O&M. Better availability. Lower emissions-compliance costs. Greater commercial flexibility.

But the business case shouldn't be built on fuel price alone — a sound feasibility study needs to weigh gas-conversion capital cost, expected capacity factor, efficiency changes, and payback period together.

In many existing plants, gas conversion isn't just a fuel modification — it's an opportunity to lower the levelized cost of electricity, improve asset reliability, and extend the plant's commercially useful life.

At EGYPTROL, our experience in power-plant engineering, commissioning, operation, and brownfield modifications lets us support gas-conversion projects — from commissioning procedures preparation through performance verification and handover to the Owner's operation team.

Converting from liquid fuel to natural gas isn't just about cheaper fuel.This week, we're breaking down the real economi...
07/09/2026

Converting from liquid fuel to natural gas isn't just about cheaper fuel.
This week, we're breaking down the real economics of gas conversion — and why the fuel price difference is only part of the story. Full breakdown Thursday.

Construction teams don't build plants. They build what engineering delivers.Every missing dimension, every overlooked cl...
31/08/2026

Construction teams don't build plants. They build what engineering delivers.

Every missing dimension, every overlooked clash, every unverified assumption eventually becomes a construction problem. This week, we look at how better engineering builds better construction. Full post Thursday.

Don't compare the survey cost. Compare the project cost.Traditional measurements vs. laser scanning — which one actually...
24/08/2026

Don't compare the survey cost. Compare the project cost.
Traditional measurements vs. laser scanning — which one actually saves you money? This week, we break down the real difference. Full post Thursday.

Old drawings explain yesterday. Laser scanning captures today. In brownfield engineering, reality always wins over assum...
20/08/2026

Old drawings explain yesterday. Laser scanning captures today. In brownfield engineering, reality always wins over assumptions — here's why that gap matters, and what it costs when it's ignored.
https://vmum7b2.s.gy/Yr2yJ2

The drawing is not always the plant. Years of modifications, undocumented changes, relocated valves — the plant on paper...
17/08/2026

The drawing is not always the plant.
Years of modifications, undocumented changes, relocated valves — the plant on paper and the plant on site are rarely the same. This week, we're breaking down why brownfield projects shouldn't start with old drawings. Full post Thursday.

Shutdowns are one of the most expensive periods in an industrial facility's life — and most of the costly surprises are ...
13/08/2026

Shutdowns are one of the most expensive periods in an industrial facility's life — and most of the costly surprises are avoidable. Here are 5 mistakes we've seen laser scanning prevent before work even begins. Which one have you run into?
https://vmum7b2.s.gy/jl5xlB

Uncertainty is expensive. Certainty starts with a scan.Shutdowns don't get expensive because of the work — they get expe...
10/08/2026

Uncertainty is expensive. Certainty starts with a scan.

Shutdowns don't get expensive because of the work — they get expensive because of the surprises. This week, we're breaking down 5 costly mistakes laser scanning can prevent before a shutdown even begins. Full post Thursday.

Address

7 Honin Ibn Is'hak Street , 7th Zone, Nasr City
Cairo

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Sunday 9am - 5pm

Telephone

+20220800304

Alerts

Be the first to know and let us send you an email when Egypt Engineering Services Company S.A.E. (EGYPTROL) posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Egypt Engineering Services Company S.A.E. (EGYPTROL):

Shortcuts

Share