MOOG Under-Bridge Access Solutions

MOOG Under-Bridge Access Solutions YOUR SPECIALIST FOR ALL TYPES OF BRIDGE ACCESS, INSPECTION AND MAINTENANCE EQUIPMENT. This makes communication between the departments quick and easy.

Our company is situated in the township Deggenhausertal near Lake Constance in the south of Germany and in the center of Europe. Easily reached from airports at Friedrichshafen, Zurich(Switzerland), Munich or Stuttgart. All our design and manufacturing capacities are centralized in one headquarters. Furthermore communication with our branch offices in the USA (Virginia) and Hong Kong flows effortl

essly. Know-how combined with state of the art equipment are the basis for efficient and customized design and production. The MOOG team consists of 40 highly trained specialists, most of them having completed their apprenticeship training at MOOG.

Praktische Schulung an den Brückenuntersichtsgeräten MBS 115 der Deutschen Bahn 🚆🔧Unser Trainer Markus war letzte Woche ...
26/05/2026

Praktische Schulung an den Brückenuntersichtsgeräten MBS 115 der Deutschen Bahn 🚆🔧

Unser Trainer Markus war letzte Woche in Thüringen im Einsatz und hat neue Mitarbeitende der DB Netz AG an deren MBS 115 geschult. Es ist immer wieder beeindruckend, diese Spezialmaschinen auf den Talbrücken der ICE-Strecken im Einsatz zu sehen.

Die Geräte ermöglichen Inspektionsarbeiten während des laufenden Zugbetriebs. Möglich wird dies durch die extrem kompakte Fahrwerksbreite von nur 1,0 m im aufgebauten Zustand. Züge können weiterhin mit hoher Geschwindigkeit passieren.

Ausgewählte technische Daten (je Maschine):
✔ Horizontale Reichweite unter der Brücke: 11,5 m
✔ Traglast: 500 kg
✔ Hydraulischer Antrieb für Steigungen bis 40 ‰
✔ Automatische Führung entlang des Bauwerks durch Tastarme

Die eingesetzten Maschinen aus dem Baujahr 2013 leisten bis heute einen wichtigen Beitrag zur Instandhaltung der Bahn-Infrastruktur.

*****

Hands-on training on the MBS 115 under-bridge inspection units of Deutsche Bahn 🚆🔧

Last week, our trainer Markus was on-site in Thuringia/Germany, training new DB employees on the impressive MBS 115 units. It remains fascinating to see these machines operating on the valley bridges of Germany’s ICE high-speed lines.

The units enable bridge inspections during regular train operations. This is made possible by the compact design with only 1.0 m chassis width when deployed, allowing trains to pass at high speed.

Key specifications (per unit):
✔ Horizontal range under the bridge: 11.5 m
✔ Load capacity: 500 kg
✔ Hydraulic drive for gradients up to 40 ‰
✔ Automatic guidance via tactile bridge-following arms

The machines in use were built in 2013 and continue to play a key role in railway infrastructure maintenance.

🍁Grüße aus Kanada🍁Unser Markus ist aktuell für Service und Training in Fall River/Kanada, im Einsatz. Von dort haben uns...
07/05/2026

🍁Grüße aus Kanada🍁

Unser Markus ist aktuell für Service und Training in Fall River/Kanada, im Einsatz. Von dort haben uns bereits tolle Fotos erreicht – im Fokus: Ein bewährtes Brückenuntersichtsgerät MBI 110 aus dem Baujahr 2011, das auch nach vielen Jahren noch zuverlässig im Einsatz ist. 💪

Vielen Dank an unseren Kunden für die starken Eindrücke und das Vertrauen! 📸

Markus wünschen wir weiterhin erfolgreiche Tage vor Ort und schon jetzt eine gute und sichere Heimreise! 👋✈️



*****

🍁Greetings from Canada🍁

Our Markus is currently on site in Fall River/Canada, providing service and training support. We have already received some great photos from the jobsite – featuring a reliable MBI 110 under-bridge inspection unit from 2011, still performing strongly even after many years in operation. 💪

A big thank you to our customer for the impressive insights and their continued trust! 📸

We wish Markus continued success on site and, already now, a safe journey back home! 👋✈️

🌿 1. Mai – Tag der Arbeit 🌿 Danke an alle, die mit ihrer Arbeit jeden Tag etwas bewegen. 💪 Genießt den Feiertag und lass...
01/05/2026

🌿 1. Mai – Tag der Arbeit 🌿
Danke an alle, die mit ihrer Arbeit jeden Tag etwas bewegen. 💪
Genießt den Feiertag und lasst es euch gutgehen! ☀️🌷

*****

🌿 May 1st – Labour Day 🌿
Thank you to everyone who makes a difference every day through their work. 💪 Enjoy the holiday! ☀️🌷

SCHON GEWUSST?! Wissenswertes von MOOG Für die Bedienung eines MOOG Brückenuntersichtsgerätes ist ein individuelles Bedi...
30/04/2026

SCHON GEWUSST?!
Wissenswertes von MOOG

Für die Bedienung eines MOOG Brückenuntersichtsgerätes ist ein individuelles Bedienertraining erforderlich. Dabei wird die sichere und effiziente Handhabung der Maschine praxisnah vermittelt. Im Anschluss erhalten die TeilnehmerInnen ein entsprechendes Zertifikat. Das Training ist bei jedem Maschinenkauf inklusive.

Hierfür gibt es zwei Möglichkeiten:

📍 Training bei MOOG:
Praxisnahe Schulung auf der betriebseigenen Testbrücke – kombiniert mit einem Aufenthalt im wunderschönen Bodenseekreis.

🌍 Training beim Kunden vor Ort:
MOOG Trainer sind weltweit im Einsatz und sammeln dabei Erfahrungen in unterschiedlichsten Regionen sowie im Austausch mit verschiedenen Kulturen und Arbeitsweisen.

So oder so: Jedes Training ist eine wertvolle Erfahrung und immer etwas Besonderes. ✨

***********************

DID YOU KNOW?!
Facts from MOOG

Operating a MOOG under-bridge inspection unit requires individual operator training. This hands-on training teaches the safe and efficient handling of the machine in a practical setting. Upon completion, participants receive an official certificate. The training is included with every machine purchase.

There are two options available:

📍 Training at MOOG:
Hands-on training on the company’s own test bridge – combined with a stay in the beautiful Lake Constance region.

🌍 On-site training at the customer’s location:
MOOG trainers operate worldwide, gaining experience in a wide range of regions and through interaction with different cultures and working methods.

Either way: Every training session is a valuable and unique experience. ✨

🚀 Ein Blick hinter die Kulissen bei MOOG!Im Rahmen von „Wissen was geht!“ ist MOOG einer der teilnehmenden Ausbildungsbe...
16/04/2026

🚀 Ein Blick hinter die Kulissen bei MOOG!

Im Rahmen von „Wissen was geht!“ ist MOOG einer der teilnehmenden Ausbildungsbetriebe im Bodenseekreis und öffnet seine Türen für alle Schülerinnen und Schüler, die ihre berufliche Zukunft entdecken möchten. 💡

📅 Unser Termin in den Sommerferien – jetzt vormerken:
Donnerstag, 3. September 2026 | 10:00 – 12:00 Uhr

Vor Ort erhältst du spannende Einblicke ins Unternehmen und kannst mehr über diese Ausbildungsberufe erfahren:
📐 Technischer Produktdesigner
🔧 Industriemechaniker
⚙️ Konstruktionsmechaniker

📌 Teilnahme ab 14 Jahren möglich
📌 Rechtzeitig anmelden – die Plätze sind begrenzt!
👉 https://www.wissen-was-geht.de/event/moog-gmbh-bruckenzugangstechnik

✨ Du möchtest schon vorher bei MOOG vorbeischauen?
Kein Problem! Besuche uns beim Gewerbetag Deggenhausertal an unserem AZUBI-Infopoint:

📅 Sonntag, 21.06.2026 | 11:00 – 16:00 Uhr
👉 Weitere Infos folgen in Kürze!

04/04/2026
🎉 Herzlich willkommen im MOOG-Team, Klaus!Seit gestern unterstützt Klaus unser Team in der Elektromontage – wir freuen u...
02/04/2026

🎉 Herzlich willkommen im MOOG-Team, Klaus!

Seit gestern unterstützt Klaus unser Team in der Elektromontage – wir freuen uns sehr, dich an Bord zu haben! 🙌

Lieber Klaus, wir wünschen dir einen erfolgreichen Start, spannende Einblicke und ein tolles Kennenlernen mit deinen neuen Kolleginnen und Kollegen.

Auf eine großartige Zusammenarbeit! 🚀

*****

🎉 Welcome to the MOOG team, Klaus!

Since yesterday, Klaus has been strengthening our electrical assembly team – we’re very happy to have you on board! 🙌

Dear Klaus, we wish you a successful start, exciting insights, and a great time getting to know your new colleagues.

Here’s to a fantastic collaboration! 🚀

🚆 Weiterer Meilenstein erreicht!Die Abnahme des in Auftrag gegebenen MBL 1200 auf Zweiwegechassis macht große Fortschrit...
31/03/2026

🚆 Weiterer Meilenstein erreicht!

Die Abnahme des in Auftrag gegebenen MBL 1200 auf Zweiwegechassis macht große Fortschritte: Die Zwischenabnahme beim Lieferanten des Zweiwegechassis wurde erfolgreich abgeschlossen. 💪

Ein besonderes Highlight: Die Maschine wurde bereits auf der Eisenbahnstrecke umfassend durchgeprüft – begleitet von beeindruckenden Aufnahmen. 📸

Damit ist ein weiterer wichtiger Schritt in Richtung Endabnahme mit dem Kunden geschafft. Als Nächstes stehen zusätzliche Tests zur Entgleisungssicherheit und weitere Prüfungen durch die Deutsche Bahn an.

Wir werden berichten, sobald das Projekt abgeschlossen und die Maschine an den Kunden überreicht werden konnte.

*****

🚆 Another milestone achieved!

The acceptance process for the commissioned MBL 1200 on a road/rail chassis is making great progress: The interim acceptance at the two-way chassis supplier has been successfully completed. 💪

A special highlight: The machine has already been thoroughly tested on the railway track – accompanied by impressive photos. 📸

This marks another important step towards final acceptance with the customer. Next, further tests on derailment safety and additional inspections by Deutsche Bahn will follow.

We will provide updates once the project is completed and the machine has been handed over to the customer.

Adresse

Im Gewerbegebiet 8
Deggenhausertal
88693

Benachrichtigungen

Lassen Sie sich von uns eine E-Mail senden und seien Sie der erste der Neuigkeiten und Aktionen von MOOG Under-Bridge Access Solutions erfährt. Ihre E-Mail-Adresse wird nicht für andere Zwecke verwendet und Sie können sich jederzeit abmelden.

Teilen