Water well drilling rig

Water well drilling rig Sales of various drilling rigs

Advantages of tracked geological exploration drilling rig1. the hydraulic drilling tower, saves time and effort in opera...
15/01/2025

Advantages of tracked geological exploration drilling rig

1. the hydraulic drilling tower, saves time and effort in operation,
2. therubber tracks, lightweight and a low life cycle cost. It can reduce walking noise as well
3. four hydraulic support legs, better leveling
4. the electric starting diesel engines can save labor operators
5. It is equipped with BW-160 mud pump

21/03/2024

GK 200 drilling rig machine ,for water well drilling or exploration coring ,welcome your inquiry ,my friends

09/01/2024

Prevention method of drilling tool breaking of water well drilling rig
1. All pipes, joints and couplings shall be stored and used according to the new and old degree. Check the bending and wear of drilling tools by lifting and lowering drilling tools, correcting hole depth and relocation time.
2. It is forbidden to use a sledge hammer to knock the drill pipe and its joint when screwing and unloading the drilling tool.
3. When the rotary resistance is too large during reaming or drilling, it is not allowed to start the machine forcibly.
4. Master reasonable WOB, and do not blindly pressurize drilling.

二十六,转盘的重要性
我们在选择打井机转盘的时候,其转盘一定要选择大扭矩的以及一定转速的。这样才能够保障打井机能够正常的运行和保障工作效率。 然而,大家应该明白的是对于打井机转盘的选择要选择具有抗震性能的转盘,以及要能够耐受冲击和防止腐蚀的能力。这样的转盘才能够在打井机运行的时候提高工作效率,增加使用寿命。由于打井机在运行的时候需要循环的转动,因此对于转盘的选择一定要注意选择能够正反旋转的。如此一来就能够保障打井机的正常运行,另外对于在选择转盘的时候还要注意其密封性如何,选择密封性好的以及润滑效果好的转盘。以免在运行中泥浆或者其他的脏东西进入到转盘中。如果不小心进入脏东西,那么就会影响到转盘的正常转动,使打井机停止运行
When we select the rotary table of the drilling machine, we must select the rotary table with high torque and a certain speed. Only in this way can we ensure the normal operation and work efficiency of the drilling machine. However, it should be understood that the rotary table of drilling rig should be selected with anti-seismic performance and the ability to withstand impact and prevent corrosion. Such a rotary table can improve the working efficiency and increase the service life when the drilling rig is running. Since the drilling machine needs to rotate circularly during operation, the rotary table must be selected with positive and negative rotation. In this way, the normal operation of the drilling machine can be guaranteed. In addition, when selecting the rotary table, attention should be paid to its sealing performance. Select the rotary table with good sealing performance and good lubrication effect. To prevent mud or other dirt from entering the rotary table during operation. If you accidentally enter the dirt, it will affect the normal rotation of the rotary table and stop the drilling machine.

二十七,水井钻机在工矿铁路施工应用中的特点
1、水井钻机分为立柱架和座架两种钻架形式,可以根据煤的巷道高低和使用选择不同的钻架。
 2、水井钻机在打孔同时能把网孔导管顶入孔内,这对于在打孔不成形的及松软煤层的高瓦斯矿井的瓦斯抽放解决了关键性的难题。所以该钻机又叫做导管钻机或顶管钻机。
3、水井钻机选用了高压密封钻杆和底孔马达,就能将钻进能力大大提高(避免了钻机扭动钻杆自身重量的强大扭矩力),所以该钻机又称作底孔马达钻机。
 4、水井钻机在配备一台高压水发生器和选用高压密封钻杆就能对透气性低的煤层进行割缝,从而提高瓦斯抽放效率和大大缩短抽放时间。该钻机采用液压传动机构,具有钻进能力大、速度快、操作简单、工作稳定可靠、移动安装方便等特点。
Characteristics of 1 well drilling rig in industrial and mining railway construction
1. The water well drilling rig is divided into two types of drill frames: column frame and pedestal frame. Different drill frames can be selected according to the height and use of the coal roadway.
2. The water well drilling machine can push the mesh pipe into the hole while drilling, which solves the key problem of gas drainage in high gassy mines with unformed holes and soft coal seams. So this drill is also called pipe jacking drill or pipe jacking drill.
3. The high-pressure sealed drill pipe and bottom hole motor are selected for the water well drilling rig, which can greatly improve the drilling capacity (avoiding the strong torque force of the drill pipe when the drill rig torques its own weight). Therefore, the drilling rig is also called bottom hole motor drilling rig.
4.When equipped with a high-pressure water generator and a high-pressure sealed drill pipe, the water well drilling rig can slit the coal seams with low permeability, so as to improve the gas drainage efficiency and greatly shorten the drainage time. The drill adopts hydraulic transmission mechanism, which has the characteristics of large drilling capacity, fast speed, simple operation, stable and reliable operation, convenient movement and installation, etc.

03/01/2024

ST 30 drilling rig is a kind of portable multi-purpose engineering drilling rig, it is suitable for geological exploration, core sampling, blasting, inspection hole, small domestic water well and civil buildings, bridges, railways, highways and other industries,this rig is light weight, portable ,easy movement and good price ,here is the customer feedback

02/01/2024

Precautions for Use of Crawler Chassis of Crawler Hydraulic Drilling Rig
1. All traveling wheels are lubricated once and do not require refueling and maintenance at ordinary times. However, the planetary gearbox of the traveling reducer should be inspected once after one year of operation. Turn the cover on the outer end face of the oil drain hole to the lower position and loosen the screw plug. If the lubricating oil is found to be seriously contaminated, the oil should be replaced in a timely manner.

2. Check the tightness of the track after completing each project. Check that the front anchor plate and rear leg of the mast are used to lift the chassis off the ground, and the intermediate tread of the lower track should be kept within the outer edge of the roller. If it is too loose, open the square cover on the side of the traveling frame, remove the anti retreat clamp block, and tighten it to meet the requirements. After that, install the clamp block, tighten the lock bolt, and cover the cover plate. When replacing the track, adjust the tensioning screw to the position inside the guide wheel for easy replacement. Inspection standard for drilling machines above 32T: Use the mast front anchor plate and rear legs to lift the chassis off the ground. The middle tread of the lower track should be kept within the outer edge of the roller. If it is too loose, open the square cover on the side of the traveling frame and inject grease with an oil gun to tighten it to meet the requirements. Install the cover plate on the rear cover. When replacing the track, unscrew the one-way valve seat and drain the lubricating grease to adjust the guide wheel to the inside position for easy replacement.
3. Keep the chassis clean at ordinary times. Wash it thoroughly after completing each project. During operation and walking, timely clean the mud or stones embedded in the grooves on both treads of the track to prevent damage to the track or derailment. During the use of rubber tracks, it is necessary to avoid rapid starting or turning on sharp protruding stones. The rubber surface should not come into contact with oil and should be immediately wiped clean once there is oil.
4. Before the drilling rig enters the site, it is necessary to clean the site so that the drilling rig can turn and adjust its position on a relatively flat ground. Do not touch the ground at three points and hang in the air with one foot. Turning when the engine is tilted can easily cause the tracks to fall off. When the track is derailed, it should be restored according to two steps.

25/12/2023

for the drilling rig clutch :First, check the clutch clearance, which is the clutch shaft
The clearance between the clutch pawl and the bearing. If the gap is too large
Big, too loose, the clutch travel is not enough, it's easy to release
Not open. If the gap is too small, very tight, the clutch capacity
Easy to slip. Adjusting the clutch is adjusting the internal movement
The itinerary of the film.
The first step is to loosen all three adjustment screws
Drop to allow the operating handle to move freely, then use
Tighten each adjustment screw by hand. It's done with one hand on one side
Tighten the movable clutch handle on one side until all three screws are tightened
Silk cannot be twisted by hand until it reaches its limit. Then use two wrenches
Hands, lock the back of the joint tightly, that's it

When the well bit slips, it can be handled. After two times of tripping in, the thickness of the muck is determined thro...
30/11/2023

When the well bit slips, it can be handled. After two times of tripping in, the thickness of the muck is determined through the number on the display. After looking at the soft and hardness of the dropped address, if there is a lot of soil and it is hard clay, a drill bucket smaller than the pile diameter is used to solve the problem of slipping. Because there is a large gap between the diameter drill bucket and the hole wall, the dropped soil is under the action of the total amount of drill pipe bucket and pressure, Through the gap between the drill bucket and the hole wall, the small-diameter drill bucket can normally drill when it contacts the solid soil. The large-diameter drill bucket is squeezed into the small hole after two times of running in, so that the large-diameter drill bucket can normally enter the small hole

08/11/2023

How many meters should a well be drilled for good water quality?
A well is usually drilled to a depth of thirty meters to obtain clean water quality, preferably below a rock layer. The water quality in this layer is best and cleanest, and it is best to drill to a depth of fifty meters to store more water. Drilling method: Select a flat plot of land as the site for drilling a well, not close to the drainage ditch or the house. Then, ask the drilling master to come to the site to check and determine where to drill the well. Then, pull the machinery to the site and hang the drilling equipment. The drilling power is output by the diesel engine. First, open the surface soil, add water to the well pit, and make the drill bit easy to rotate. Another water tank with a diameter of two meters should be drilled outside, and turbid water (mud water) should be discharged from one of the positions. This way, the drilling will continue. When the drilling reaches about four meters, the drill bit will be mechanically lifted out of the ground, and then the rotary cylinder will be unscrewed to remove and reinstall the clay blocks inside the cylinder. At the same time, a steel cylinder will be added, and then reinforced and placed in the well pit before repeating the previous drilling method.

Address

Shijiazhuang
050000

Opening Hours

Monday 08:00 - 18:00
Tuesday 08:00 - 18:00
Wednesday 08:00 - 18:00
Thursday 08:00 - 18:00
Friday 08:00 - 18:00
Saturday 08:00 - 18:00
Sunday 08:00 - 18:00

Telephone

+8613343314303

Website

Alerts

Be the first to know and let us send you an email when Water well drilling rig posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Water well drilling rig:

Share