27/08/2026
⛰️⚙️Drilled at the foot of the South Tianshan Mountains, the Bozi 107-3 well at 's Tarim Oilfield is racing downward at full pace — 24.3 days ahead of schedule as of Aug 4.
🛢️💡It is not easy, though. The team faced some of the toughest drilling conditions — an ultra-thick gravel layer that's brutally hard and highly abrasive. Their answer? An innovative combo of drilling parameters, optimized step by step to keep pushing forward.