HC Petroleum Equipment

HC Petroleum Equipment HC Petroleum Equipment is an oilfield service company, providing oil and gas industry with products and services for oil and gas production.

Custom Flare System for Kazakhstan Oil & Gas ProjectHC recently supplied a customized flare system for an oil and gas pr...
24/07/2026

Custom Flare System for Kazakhstan Oil & Gas Project

HC recently supplied a customized flare system for an oil and gas project in Kazakhstan.

Designed for safe gas disposal and reliable operation, the flare system helps improve process safety and supports stable production performance in oil and gas facilities.

As an experienced oil and gas equipment manufacturer, HC provides customized solutions including flare systems, separators, sand separators, heat exchangers, and skid-mounted equipment for global energy projects.

Learn more about our oil & gas equipment solutions:
🌐 https://www.hcpetroleum.hk/

šŸ“§ Email: [email protected]

Russian Customized Shell and Tube Heat Exchanger Successfully Passed Inspection.HC has successfully completed a customiz...
25/06/2026

Russian Customized Shell and Tube Heat Exchanger Successfully Passed Inspection.
HC has successfully completed a customized shell and tube heat exchanger manufactured in accordance with ASME BPVC standards for oil & gas applications.
Key Data:
Design Pressure: 1.0 MPa
Temperature Range: -36°C to 250°C
Hydro Test: 1.5 MPa
RT: Fully compliant
Engineered for stable thermal performance and reliable operation under demanding industrial conditions.
For more information, please click: https://www.hcpetroleum.hk/news-detail/540

Skid-mounted Gas Sweetening Unit for Hā‚‚S Removal in Thailand.The skid mainly includes a vertical sweetening vessel, inle...
15/06/2026

Skid-mounted Gas Sweetening Unit for Hā‚‚S Removal in Thailand.
The skid mainly includes a vertical sweetening vessel, inlet filtration and separation units, desulfurization media tanks, regeneration-related auxiliary systems, and an integrated PLC control cabinet. The vertical vessel is filled with sulfur removal media to absorb Hā‚‚S from the incoming gas stream, ensuring cleaner gas output for downstream use.
For more information about this device, please consult: https://www.hcpetroleum.hk/news-detail/539

Flow instability, excessive maintenance, and unexpected downtime are common challenges in crude oil transfer systems.Thi...
06/06/2026

Flow instability, excessive maintenance, and unexpected downtime are common challenges in crude oil transfer systems.
This skid-mounted crude oil transfer pump package, manufactured for a Nigeria oilfield project, is designed to support reliable and continuous crude oil transportation while simplifying installation and maintenance in the field.
Reliable equipment means more than moving fluids—it helps keep production running.
More information about this project: https://www.hcpetroleum.hk/news-detail/537

Third Repeat Order from Venezuela The 5 gas scrubbers ordered by our Venezuelan customer have now completed pipeline ass...
16/05/2026

Third Repeat Order from Venezuela

The 5 gas scrubbers ordered by our Venezuelan customer have now completed pipeline assembly and entered final inspection before shipment.

This is the customer’s third repeat order for similar equipment.

In gas processing applications, stable liquid separation performance is critical for protecting downstream compressors and process systems under changing field conditions.

For this batch, HC optimized the skid structure and piping layout to improve transportation reliability and simplify on-site installation.

We appreciate the customer’s continued trust and look forward to supporting upcoming projects together.
More information can be found at: https://www.hcpetroleum.hk/news-detail/532

HC has completed the delivery and on-site installation of a skid-mounted wastewater treatment system for natural gas pur...
30/04/2026

HC has completed the delivery and on-site installation of a skid-mounted wastewater treatment system for natural gas purification applications.

Built to handle high COD, high salinity, and complex wastewater, the system combines advanced oxidation and crystallization technologies to improve stability and reduce downstream load.

A practical solution for challenging gas processing wastewater conditions.

šŸ“§ [email protected]

🌐 www.hcpetroleum.hk

Flare Knockout Drum Successfully Commissioned in KazakhstanHC recently completed the installation and commissioning of a...
28/04/2026

Flare Knockout Drum Successfully Commissioned in Kazakhstan

HC recently completed the installation and commissioning of a flare knockout drum for a natural gas wellsite project in Kazakhstan. The unit is designed to remove entrained liquids from vent gas before it reaches the flare system, helping improve combustion stability, reduce operational risks, and support safe field operations.

With compact structure, reliable performance, and suitability for demanding outdoor environments, this project once again demonstrates HC’s capability in supplying oilfield surface equipment for international energy projects.

Read more: https://www.hcpetroleum.hk/news-detail/529

A customized natural gas metering skid by HC Petroleum has successfully arrived at the project site in Kenya.Read more a...
20/04/2026

A customized natural gas metering skid by HC Petroleum has successfully arrived at the project site in Kenya.
Read more about the project and our solution.https://www.hcpetroleum.hk/news-detail/527

Our natural gas compressor package has been running steadily for several months at the GZU-37 station in the Karazhanbas...
26/03/2026

Our natural gas compressor package has been running steadily for several months at the GZU-37 station in the Karazhanbas oilfield, Kazakhstan.
From installation to operation, the unit has shown stable performance under local field conditions. For oil & gas projects, long-term reliability is always the real test — not just specifications on paper, but how the equipment performs day after day on site.
It’s always good to see our equipment working as expected in real operating environments.
Learn more: https://www.hcpetroleum.hk

A desander skid package for our Malaysia oil & gas project is now completed and ready for shipment.Designed for sand rem...
25/03/2026

A desander skid package for our Malaysia oil & gas project is now completed and ready for shipment.

Designed for sand removal in oil & gas production systems, this unit is built as a compact skid-mounted solution to simplify installation and ensure stable operation in the field.

From workshop fabrication to final inspection, the focus remains the same — delivering equipment that performs reliably under real operating conditions.

Looking forward to sharing more updates once it’s installed on site.

🌐 https://www.hcpetroleum.hk/

šŸ“§ [email protected]

Address

Luoyang

Opening Hours

Monday 09:00 - 17:30
Tuesday 09:00 - 17:30
Wednesday 09:00 - 17:30
Thursday 09:00 - 17:00
Friday 09:00 - 17:30
Saturday 09:00 - 16:00
Sunday 09:00 - 17:30

Telephone

+8613525953919

Alerts

Be the first to know and let us send you an email when HC Petroleum Equipment posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to HC Petroleum Equipment:

Shortcuts

Share