Sunzo Group, Soft Ground Improvement Experts

Sunzo Group, Soft Ground Improvement Experts Soft Ground Improvement Experts, Vacuum Preloading Soft Soil Process Specialist

Blow filling projectSoft Ground Improvement
15/08/2024

Blow filling project
Soft Ground Improvement

Vacuum preloading (consolidation) method  for improving fine grain soil. This method utilizes atmosphere pressure as a t...
15/08/2024

Vacuum preloading (consolidation) method for improving fine grain soil. This method utilizes atmosphere pressure as a temporary surcharge for improving fine grain soft soil.

The basic idea of vacuum preloading method is applying a vacuum suction into an isolated soil mass to reduce the atmosphere pressure and pore water pressure in the soil, resulting soil consolidation and effective stress enhance without change the total stress.

Basically, whole vacuum preloading system consists of drainage system, isolation system and vacuum pumps. Once generated in vacuum pumps, vacuum suction rapidly spreads into soils along drainage system, reducing atmosphere and pore water pressure and forming pressure difference between vertical drains and pore water in soils. This pressure difference cause the pore water flows toward vertical drain which means soil consolidation happens. Vacuum suction keeps taking out water and air and accelerating soil consolidation.

Drainage system is an interconnected network of PVD, horizontal filter pipes and sand layer, forming a complete path for spreading of vacuum suction and water flow.

Isolation system is used to cutoff leakage of water & air below it. It consists of geomembrane, the soft clay itself and cutoff wall if necessary.

We at SUNZO have more than twenty Hitachi excavator equipment used for PVD rigs and construction. They are placed at the...
15/08/2024

We at SUNZO have more than twenty Hitachi excavator equipment used for PVD rigs and construction. They are placed at the factory base when idle and can be maintained and maintained. When the project requires construction, it can be immediately transported to the project site to start. construction

prefabricated vertical drain installation,construction safety and quality inspection
14/08/2024

prefabricated vertical drain installation,construction safety and quality inspection

prefabricated vertical drains (PVD) installation and Vacuum Consolidation Soft Ground Improvement Specialist
14/08/2024

prefabricated vertical drains (PVD) installation and Vacuum Consolidation Soft Ground Improvement Specialist

Sunzo prefabricated vertical drain (PVD) rigs
14/08/2024

Sunzo prefabricated vertical drain (PVD) rigs

Also known as Wick Drains, Prefabricated Vertical Drains (PVDs) are composed of a durable plastic core (usually polyprop...
14/08/2024

Also known as Wick Drains, Prefabricated Vertical Drains (PVDs) are composed of a durable plastic core (usually polypropylene) wrapped around a synthetic geotextile (i.e. a filter jacket) to facilitate the movement of water through slow-draining soils.
The principal of installation of the vertical drainage is based on the insertion of a steel mandrel into the ground with a drain inside. The drain extension at the bottom of the mandrel can be connected to an anchor plate or stick to help the anchoring of the drain. Automatic anchoring systems are also available keeping the drain at depth during retraction of the mandrel. After the mandrel has reached the surface, the drain is cut and a new anchor plate is connected to the bottom of the next drain. The mandrel is pushed into and retracted from the ground through a system of cylinders and winches, which in turn are propelled by the excavators’ hydraulic system.

Prefabricated Vertical Drains (PVD), Wick Drains,
12/08/2024

Prefabricated Vertical Drains (PVD), Wick Drains,

SUNZO PVD RIGS,Ground Improvement Vertical Drain PVD Rig
12/08/2024

SUNZO PVD RIGS,Ground Improvement Vertical Drain PVD Rig

Address

Xianchong Village, Qiaonan Street, Panyu District
Guangzhou
511486

Opening Hours

Monday 08:30 - 17:30
Tuesday 08:30 - 17:30
Wednesday 08:30 - 17:30
Thursday 08:30 - 17:30
Friday 08:30 - 17:30

Telephone

+12039218718

Alerts

Be the first to know and let us send you an email when Sunzo Group, Soft Ground Improvement Experts posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sunzo Group, Soft Ground Improvement Experts:

Share