16/09/2026
❓How long will take to finish assembling of a high=end maglev turbo blower?
💡Now a test shown that only 30 minutes!
A master with over 5 years of experience, along with a young employee who had just joined the factory for 2 months, completed the installation of the internal motor of the magnetic levitation blower within 30 minutes through their efficient and orderly operation procedures, proficient techniques, and excellent teamwork.
The remaining work is to connect the cables by electrical engineers, then complete machine testing can be carried out immediately.
Once all the components are ready, with such this efficient and high-quality work, the production lead time can be significantly shortened, ensuring that the equipment can be delivered to the customers within 30 to 45 days at any time.
In this scene, we witness direct cooperation between people and the significance of the transmission of technology from the older generation to the younger one.
Click:
www.itandt-cn.com
baba-itnt.co.kr
www.youtube.com/
Contact:
[email protected]
https://youtu.be/LPVwz3qLNB0
How long will take to finish assembling of a high=end maglev turbo ...