The drywall is up. The doors are hung. And the job stops because the hardware isn’t here.
Hardware is the smallest line on the schedule and the one most likely to blow it. Not because anything went wrong, but because it got specced last and ordered late.
Three moves fix it. Spec early, while the door schedule is still being drawn. Confirm the finish and the handing in writing before anything ships. Lock your quantities so the order is held for your job instead of sold out from under it.
Do that and hardware stops being the thing that surprises you on install day.