09/02/2026
Another major project coming together through a true team effort.
This 150/30-ton overhead crane and 295-foot runway system features an open winch design, 500-amp conductor bar, 100 lb rail, bridge-mounted LED lighting, anti-collision technology and VFD control throughout.
A huge thank you to our Manufacturing and Electrical teams for the hard push to get this equipment completed and ready on schedule.
And an equally big shoutout to our Installation team for executing the plan in the field, working through challenging high-wind conditions and delivering the installation with precision.
Great work across every department to bring this one together. 💪🏗️