05/25/2026
Every site comes with constraints. The goal is to work through them without compromising the outcome.
For the Malone Road Subdivision Phases 1 & 2 in Ladysmith, the site presented a mix of environmental and technical challenges. Sensitive riparian areas, a creek crossing, an existing park, and steep terrain all needed to be considered.
Newcastle provided civil engineering services across transportation, stormwater, sanitary, and water systems, supporting both the initial 13-lot Phase 1 and future Phase 2 development.
Key elements of the project included:
• Designing storm outfalls that met provincial requirements and reduced erosion
• Routing services through an existing park while preserving mature trees
• Developing a culvert design sized for the full tributary area
• Extending infrastructure to support future phases without retrofit work
The result is a subdivision that supports long-term growth while working within the constraints of the site.
Learn more: https://lnkd.in/geyxWjTB