09/15/2026
A major rooftop upgrade starts here.
At Lockerby Composite School, the Bisschops team coordinated the crane-assisted removal of two existing rooftop HVAC units, preparing the site for the replacement phase.
▶️ Watch Part 1: https://youtu.be/pRfOunrbFcs?si=WQrbr3r-8kQB9Dan
Next up, the installation of the new units.
hashtag hashtag hashtag hashtag
The first phase of a rooftop HVAC replacement is underway at Locker...