23/07/2026
đī¸ Cold Storage Project â Base Casting Work đī¸
āĻāϞāĻšāĻžāĻŽāĻĻā§āϞāĻŋāϞā§āϞāĻžāĻš, āĻāĻŽāĻžāĻĻā§āϰ Cold Storage Project-āĻāϰ āĻŦā§āĻ āĻĸāĻžāϞāĻžāĻ (Base Casting) āĻāĻžāĻ āĻāϞāĻŽāĻžāύ āϰāϝāĻŧā§āĻā§āĨ¤
āĻĸāĻžāϞāĻžāĻāϝāĻŧā§āϰ āĻĒā§āϰā§āĻŦā§ āϰāĻĄ āĻŦāĻžāĻāύā§āĻĄāĻŋāĻ āĻ āϰāĻĄā§āϰ āĻāĻžāĻā§āϰ āϏāĻ āĻŋāĻāϤāĻž āĻā§āĻāĻŋāĻ āĻāϰāĻž āĻšāϝāĻŧā§āĻā§ āĻāĻŦāĻ āĻĒā§āϰāϝāĻŧā§āĻāύā§āϝāĻŧ āĻŽāĻžāύ āύāĻŋāϝāĻŧāύā§āϤā§āϰāĻŖ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāĻž āĻšāϝāĻŧā§āĻā§āĨ¤ â
āĻĒā§āϰāĻā§āĻļāϞāĻāϤ āύāĻŋāϰā§āĻĻā§āĻļāύāĻž āĻ āĻā§āĻŖāĻāϤ āĻŽāĻžāύ āĻŦāĻāĻžāϝāĻŧ āϰā§āĻā§ āĻāĻžāĻ āĻāĻāĻŋāϝāĻŧā§ āĻāϞāĻā§āĨ¤
āĻāύāĻļāĻžāĻāϞā§āϞāĻžāĻš, āϏāĻĢāϞāĻāĻžāĻŦā§ āϏāĻŽā§āĻĒāύā§āύ āĻšāĻŦā§ āĻāĻŽāĻžāĻĻā§āϰ āĻāĻ āĻĒā§āϰāĻāϞā§āĻĒāĨ¤ đī¸âī¸
The base casting work of our Cold Storage Project is underway.
Before casting, the accuracy of rod binding and rod work has been checked and the necessary quality control has been ensured. â
The work is progressing by maintaining the engineering instructions and quality standards.
InshaAllah, our project will be completed successfully. đī¸âī¸
Samiya Architect and Engineering
Supervision âĸ Construction