17/06/2026
Before a playground reaches site, every component moves through the final stages of finishing, protection and preparation.
In Chapter 3 of our Inside the Making series, we're taking you behind the scenes at Monbulk to look at powder coating, timber finishing, small assemblies and quality control.
From durable powder-coated steel through to carefully prepared timber components, every detail is checked and refined before installation begins.
Managing these processes in-house helps us maintain quality, consistency and attention to detail throughout every project.
Designed. Manufactured. Installed.
Proudly Australian made ๐ฆ๐บ
Stay tuned for our final chapter: Installation ๐