Rethinking how plantrooms get built.
At Kavanaghs, we've just completed a prefabricated plantroom comprising more than 40 multi-service modules, demonstrating how offsite manufacturing is transforming major projects.
Each module left our factory fully fitted with ductwork, filter plenums, fans, attenuators, electric heaters, FCUs, dampers, hot and cold-water pipework, valve sets and strainers, all insulated, tested and ready for installation.
The real advantage? Programme certainty.
Module fit-out was underway before the plantroom floor was poured and continued while the building steelwork was being erected. By the time the plantroom was ready, finished modules were ready to be delivered, lifted, connected and commissioned.
No stick-build sequencing. No trade congestion. No waiting for one activity to finish before the next can start.
✅ Shorter plantroom program
✅ Site trades avoiding congestion
✅ Factory-controlled quality
✅ Projects that stay on track
Prefabrication shifts work off the critical path through parallel construction, reducing risk and accelerating delivery.